Off-Grid Living in Sublette County, Wyoming
Sublette County has countywide zoning but no building code or building department, so permits focus on septic, roads, and zoning compliance rather than construction standards. Wells and larger wastewater systems fall to the state, while greywater and rainwater aren't separately addressed at the county level.
Is it legal to live off-grid in Sublette County, Wyoming?
There is no outright ban on living off-grid in Sublette County, Wyoming - it is legal but regulated. Zoning and land use are restricted, putting a cabin, tiny home, or RV on raw land is set locally and vary by area, and building permits are set locally and vary by area. Plan around septic/wastewater (restricted) and disconnecting from utilities (generally allowed). Because these rules are set locally, confirm the specifics with Sublette County before you buy land or build.
The verdict for Sublette County
- Zoning: Restricted
- Dwellings, tiny homes: Varies locally
- Building permits: Varies locally
- Septic: Restricted
- Greywater reuse: Unclear - verify
- Rainwater harvesting: Unclear - verify
- Private wells: Restricted
- Living disconnected from utilities: Generally allowed
Sublette County at a glance
Who to call in Sublette County
- Zoning Sublette County Planning & Zoning Department 307-367-4375
- Planning Sublette County Planning & Zoning Board / Commission 307-367-4375
- Environmental Wyoming DEQ, Water Quality Division (Water & Wastewater Program) 307-777-5501
- Wells and water Wyoming State Engineer's Office - Ground Water Division
Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.
Sublette County, Wyoming is one of the more interesting places to look at off-grid living because it's actually done something a lot of rural Wyoming counties haven't: it adopted countywide zoning. That surprises people who assume "Wyoming county" means no rules at all. At the same time, Sublette County has NOT adopted a residential building code, so the picture is a real mix of "yes, there are rules" and "no, not for that."
Zoning comes from the county itself, under authority the state gave counties in Wyoming Statutes 18-5-201 through 18-5-207. Every piece of private land in unincorporated Sublette County sits in a zoning district, though this doesn't reach federal or state public land (Forest Service, BLM, state land). Before you buy or build, I'd check which district your parcel falls in, because permitted uses, guest houses, and height limits (30 or 35 feet depending on district) vary.
Building permits are a lighter touch than most people expect. Sublette County has no building department and doesn't enforce the IBC, snow load, wind load, or electrical codes, and it doesn't issue certificates of occupancy. That said, the county Planning & Zoning office does require permits for specific things: signs, road access, road utility crossings, septic systems, and mailbox installation, plus certain building-related administrative permits tied to zoning (setbacks, heights). So "no building code" doesn't mean "no permits at all."
Septic is where the county gets hands-on. A county septic permit is required for new systems or replacements, conventional systems (under a certain daily flow, using standard trench or bed disposal) are handled at the county level, and anything larger or non-domestic escalates to Wyoming DEQ's Underground Injection Control program. Composting and chemical toilets are recognized in county definitions, but incinerating/composting toilets may also need a state DEQ permit, so I'd confirm with both offices.
Greywater and rainwater aren't specifically addressed anywhere in county code that I found. That means they default to the state DEQ wastewater framework for greywater, and Wyoming has no known statewide prohibition on rainwater harvesting, but neither is confirmed at the county level, so treat this as "probably fine, ask to be sure."
Wells are entirely a state matter. The Wyoming State Engineer's Office issues well permits (a U.W. 5 application before you drill), and the county layers on its own siting rule requiring a full acre for a domestic well plus septic system. Some subdivisions, like High Meadow Ranches, have their own water district instead.
Living off the grid itself, meaning no electric or municipal hookups, isn't something the county mandates against. It's your choice, though property owners near Pinedale, Big Piney, or Marbleton should check with those towns about hookup options if interested. One extra wrinkle worth knowing: parts of the county fall in mapped Greater Sage-Grouse habitat, triggering a state executive order's siting requirements, so that's worth checking before you pick your build site.
Sublette County in numbers
- Worst-month sun
- 2.3 peak hours/day (5.0 annual average)
- Heating degree days
- 8,768
- Precipitation / snow
- 17.18 in / 94.5 in a year
- Elevation
- 9,266 ft
- Hospital
- Bear Lake Memorial Hospital · 15.7 mi
- Fire station
- Cokeville Fire Department · 11.9 mi
- Hardware
- Ace Hardware · 15.7 mi
- Supermarket
- Broulim's · 15.6 mi
Open the full site report for this spot →
30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.
Planning a build in Sublette County
The rules above decide what you may build. The numbers below decide what you will have to build, and they come from this place rather than from a national average.
Solar: size for the worst month, not the average
Sublette County averages 5.0 peak sun hours a day across the year, but its worst month averages 2.3. That is a drop of about 53 percent. An array sized on the annual figure will therefore come up short in the worst month by roughly that much, in the season when lights, pumps, and heating fans all run hardest.
Put another way, meeting the same daily load in the worst month here takes about 2.2 times the array that the annual average implies, or a generator and the fuel budget to run it. Neither is wrong; what is wrong is discovering the gap in the first winter. The solar calculator runs this arithmetic against your own load list, and lesson four covers building that list before buying panels.
Heat: 8,768 heating degree days
That is a severe heating season, where the building envelope matters more than any appliance you can buy. Heating demand at this level dwarfs everything electrical in the house, which is why almost nobody here heats with electricity from a battery bank.
As a rough order of magnitude, a small, reasonably insulated cabin heated mainly with wood in a climate like this tends to burn in the region of 7.3 cords a season, with the real figure swinging widely on insulation, house size, and how you burn. Treat that as a bracket for planning your woodshed rather than a promise, split and stack a season ahead, and check with a moisture meter before burning. The firewood calculator and heat-loss calculator narrow it down from your own building.
Water: what the roof would actually catch
Sublette County receives about 17.2 inches of precipitation a year. A 1,000 square foot roof here would shed on the order of 9,098 gallons a year at a realistic 85 percent collection efficiency, before any losses to first-flush diversion, evaporation, or overflow in a heavy storm.
The annual total is the easy part. What sizes a cistern is the longest dry stretch, because catchment is seasonal almost everywhere and a tank that covers the average year can still run empty in August. Check the local rules too: rainwater harvesting is regulated in some states even where it is broadly allowed. The rainwater calculator works from your own roof and rainfall pattern, and lesson three covers why water is chosen before power.
Snow: 95 inches in an average year
At this level, snow is a design input rather than a nuisance. It sets the roof load your structure has to carry, it decides where a metal roof may safely shed and therefore where doors, propane tanks, and walkways must not be, and it buries a ground-mounted array at exactly the time of year the array matters most. It also makes the driveway a system: how it is graded, where the snow is pushed, and who clears it when you cannot.
Distance is part of the plan
Measured straight line from the center of Sublette County: the nearest fire station is about 11.9 miles away (Cokeville Fire Department), the nearest hospital is about 15.7 miles away (Bear Lake Memorial Hospital), the nearest supermarket is about 15.6 miles away (Broulim's). Road miles will be longer, and in winter longer again.
The fire distance is worth noting before you buy rather than at renewal: insurers commonly rate rural property partly on how far it is from a responding station and from a water source, and some decline off-grid or owner-built structures outright. Ask an agent who writes rural policies what they would need to see, while the answer can still change what you build. Lesson eleven covers the insurance and financing side.
The hospital distance sets what your first aid kit and your medical plan have to cover in the gap, and it is the number to think about before anyone in the household depends on refrigerated medication or mains-powered equipment.
Confirming this for your own parcel
On this page 4 of the eight topics are recorded as unclear or as varying within Sublette County: what counts as a dwelling, building permits and codes, greywater, rainwater harvesting. Those are the calls to make first, because they are the ones where a general answer cannot be trusted for a specific parcel. Ask for the answer in writing where the office will give it, and note the name and the date where it will not.
Where a topic is recorded as settled here (zoning, septic and sewage, wells and water rights, mandatory utility connection), the source is cited further down this page. Sources go stale, ordinances get amended, and this site logs corrections publicly rather than editing them away, so if you find something here that no longer matches the county, the corrections page is how to say so.
Before any of those calls, walk the parcel with the land walk checklist and take the questions for the county with you. The parcel check pulls flood, wetland, slope, and access data for a specific parcel and shows its sources, which is a good way to arrive at the office with the questions already framed. Lesson two is the wider version of this list.
Sources
Primary sources (statutes, agencies, municipal documents)
- Permitting - Wyoming Department of Environmental Quality deq.wyoming.gov
- Water & Wastewater - Wyoming Department of Environmental Quality deq.wyoming.gov
- Small Wastewater Systems - Wyoming Department of Environmental Quality deq.wyoming.gov
- R E G U L A T I O N S A N D I N S T R U C T I O N S STATE ENGINEER’S OFFICE wwcb.state.wy.us
- Wyoming State Engineer's Office - Water Well Construction seo.wyo.gov
- Ground Water - Wyoming State Engineer's Office - Wyo.Gov seo.wyo.gov
- FAQs - Wyoming State Engineer's Office - Wyo.Gov seo.wyo.gov
- Wyoming State Engineer's Office - e-Permit and Instructions seo.wyo.gov
Only government, statute, municipal, university, and regional-planning sources are listed. Pages used to find an issue but not to substantiate it are not cited. See how this database is researched.
Live here? Help keep Sublette County accurate.
Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.
FAQ
Common questions about off-grid living in Sublette County
Is it legal to live off-grid in Sublette County, Wyoming?
There is no outright ban on living off-grid in Sublette County, Wyoming - it is legal but regulated. Zoning and land use are restricted, putting a cabin, tiny home, or RV on raw land is set locally and vary by area, and building permits are set locally and vary by area. Plan around septic/wastewater (restricted) and disconnecting from utilities (generally allowed). Because these rules are set locally, confirm the specifics with Sublette County before you buy land or build.
Does Sublette County require a building permit to construct a home off-grid?
The county has no building code or building department, but it still requires permits for septic, road access, and other zoning-related items, so you'll want to check with Planning & Zoning before you start.
Can I collect rainwater or reuse greywater legally in Sublette County?
There's no county rule on either that I could confirm, so both fall back on the state framework; I'd call Wyoming DEQ to confirm greywater reuse specifics before setting up a system.
Do I need a permit to drill a well?
Yes, the Wyoming State Engineer's Office requires a permit before you start construction on any well, and Sublette County separately requires an acre of land for a well plus septic system.
Is it legal to live totally off the utility grid in Sublette County?
Yes, the county doesn't require hookups to electric, gas, or municipal water/sewer; it's a personal choice, not a violation.
New here, or not sure where this fits? Start here walks through the whole thing in order.
