Off-Grid Living in Goshen County, Wyoming

Goshen County, Wyoming has no zoning or building code enforcement, making dwellings, tiny homes, and off-grid utilities largely unregulated at the county level. Septic systems require a county-administered permit and all wells need a State Engineer permit, with an added restriction on new large-capacity wells in the LaGrange Aquifer area of southern Goshen County.

Is it legal to live off-grid in Goshen County, Wyoming?

There is no outright ban on living off-grid in Goshen County, Wyoming - it is generally possible. Zoning and land use are generally allowed, putting a cabin, tiny home, or RV on raw land is generally allowed, and building permits are generally allowed. Plan around septic/wastewater (restricted) and disconnecting from utilities (generally allowed). Because these rules are set locally, confirm the specifics with Goshen County before you buy land or build.

Read this before you act on anything below. This is my researched starting point for Goshen County, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.
Primary-source verified · reviewed Aug 202613 government, statute, or municipal sources are linked below; the verdict card cites them where a match exists.

The verdict for Goshen County

  • Zoning: Generally allowed
  • Dwellings, tiny homes: Generally allowed
  • Building permits: Generally allowed
  • Septic: Restricted
  • Greywater reuse: Generally allowed
  • Rainwater harvesting: Generally allowed
  • Private wells: Restricted
  • Living disconnected from utilities: Generally allowed

Goshen County at a glance

Zoning & raw-land occupancy
Generally allowedGoshen County has no countywide zoning code, confirmed by its own Planning & GIS office. Incorporated towns like Torrington, Lingle, and LaGrange may have their own zoning not covered here. source
Dwellings, tiny homes & RVs
Generally allowedWith no zoning or building inspection at the county level, tiny homes, manufactured homes, and RVs are not barred on unincorporated land, though subdivision covenants may still apply. source
Building permits & codes
Generally allowedThe county does not perform building permits or inspections; it only references the state-adopted IBC 2024 code as informational guidance, not mandatory enforcement. source
Septic & composting toilets
RestrictedGoshen County administers its own septic permit (a conventional septic system application through Planning & GIS), built on Wyoming DEQ's small wastewater general permit framework since Goshen is not one of the five counties where DEQ permits directly. source
Greywater reuse
Generally allowedNo Goshen County-specific greywater ordinance was found; it appears to follow the Wyoming DEQ small wastewater permitting framework by default. Not confirmed whether any local addition applies, so ask county Planning & GIS.
Rainwater harvesting
Generally allowedNo Goshen County rule addressing rainwater harvesting was found, so it inherits the unrestricted state baseline.
Private wells & water rights
RestrictedEvery well in Wyoming requires a State Engineer permit before construction begins, and southern Goshen County's LaGrange Aquifer area is under a special State Engineer order closing new large-capacity well permits, though small domestic/stock wells are generally exempt from that closure. source
Living disconnected from utilities
Generally allowedNeither Goshen County nor the state of Wyoming requires grid utility connection, so off-grid solar, wind, generator, well, and septic setups are permitted, though wind turbines may fall under county siting rules being developed. source

Who to call in Goshen County

Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.

I've been digging into Goshen County, Wyoming for anyone thinking about buying land here and living off-grid, and the short version is: this is about as light-touch as county government gets in Wyoming, with two big exceptions (wells and septic).

Zoning and land use. Goshen County's own Planning & GIS office states plainly that the county has no zoning regulations and no building inspections. That's an explicit local choice, not an oversight, and it's more permissive than counties that have adopted zoning. Land use is guided informally by subdivision regulations and a county land-use plan, and the Planning Commission is working on topic-specific rules (like CAFO siting and wind turbines) as they come up. If the parcel you're eyeing is inside Torrington, Lingle, or LaGrange town limits, though, all bets are off, those towns can and do run their own zoning and building codes, which I haven't researched here.

Dwellings, tiny homes, RVs. With no zoning or building code at the county level, there's nothing stopping you from putting a tiny home, manufactured home, or RV on unincorporated land. Just watch for subdivision covenants if you're in a platted subdivision, those can impose restrictions the county itself doesn't.

Building permits. The county doesn't inspect or permit construction. It does point people to the state-adopted 2024 IBC as informational guidance, but that's not mandatory county enforcement.

Septic. Here's where things get real. Goshen County isn't one of the five Wyoming counties (Campbell, Carbon, Niobrara, Platte, Weston) where the state DEQ directly issues septic permits, so Goshen handles its own permitting locally using a county application (a "Conventional Septic System Application" available through Planning & GIS), built on the state's small wastewater general permit framework for systems under 2,000 gallons/day. Composting toilets probably fall under this same umbrella based on how neighboring counties handle privies and holding tanks, but I couldn't confirm Goshen's specific treatment of composting toilets, so ask Planning & GIS directly.

Greywater and rainwater. I found no county-specific rules for either, so both default to Wyoming's general state framework. Not confirmed whether the county layers on anything extra.

Wells. Every well in Wyoming needs a State Engineer permit before you start construction, no exceptions, and Goshen adds a wrinkle: the LaGrange Aquifer area in southern Goshen County is under a special State Engineer order closing the area to new large-capacity well permits, part of an effort to sort out unadjudicated groundwater rights. Small domestic and stock wells are generally exempt from that closure but still need the standard state permit.

Utilities. No county requirement to hook up to the grid, and no state law mandating it either. Solar, wind, generators, and off-grid water/septic setups are all fair game, though wind turbines specifically may fall under the county's developing siting rules.

Bottom line: Goshen County gets out of your way on zoning and building, but don't skip the septic application or the well permit, those are real and enforced.

Goshen County in numbers

Worst-month sun
3.5 peak hours/day (5.5 annual average)
Heating degree days
6,847
Precipitation / snow
14.38 in / 32.4 in a year
Frost-free season
05-14 to 09-23
Elevation
4,311 ft
Hospital
Community Hospital · 16.2 mi
Fire station
Torrington Volunteer Fire Department · 15.1 mi
Supermarket
Kelly's Super Market · 14.6 mi

Open the full site report for this spot →

30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.

Planning a build in Goshen County

The rules above decide what you may build. The numbers below decide what you will have to build, and they come from this place rather than from a national average.

Solar: size for the worst month, not the average

Goshen County averages 5.5 peak sun hours a day across the year, but its worst month averages 3.5. That is a drop of about 35 percent. An array sized on the annual figure will therefore come up short in the worst month by roughly that much, in the season when lights, pumps, and heating fans all run hardest.

Put another way, meeting the same daily load in the worst month here takes about 1.5 times the array that the annual average implies, or a generator and the fuel budget to run it. Neither is wrong; what is wrong is discovering the gap in the first winter. The solar calculator runs this arithmetic against your own load list, and lesson four covers building that list before buying panels.

Heat: 6,847 heating degree days

That is a genuinely cold heating season, where losing heat for a few days in winter risks the plumbing and the building itself. Heating demand at this level dwarfs everything electrical in the house, which is why almost nobody here heats with electricity from a battery bank.

As a rough order of magnitude, a small, reasonably insulated cabin heated mainly with wood in a climate like this tends to burn in the region of 5.7 cords a season, with the real figure swinging widely on insulation, house size, and how you burn. Treat that as a bracket for planning your woodshed rather than a promise, split and stack a season ahead, and check with a moisture meter before burning. The firewood calculator and heat-loss calculator narrow it down from your own building.

Growing season: about 132 frost-free days

Average last frost falls around 05-14 and average first frost around 09-23, which leaves roughly 132 days between them. That figure decides what can be grown outdoors without protection, whether a season extension structure is worth building, and how much of the year food storage has to cover. Averages also hide the frost that arrives two weeks early, so plan the garden on the short end. The garden calculator and food storage calculator work from this number.

Water: what the roof would actually catch

Goshen County receives about 14.4 inches of precipitation a year. A 1,000 square foot roof here would shed on the order of 7,615 gallons a year at a realistic 85 percent collection efficiency, before any losses to first-flush diversion, evaporation, or overflow in a heavy storm.

The annual total is the easy part. What sizes a cistern is the longest dry stretch, because catchment is seasonal almost everywhere and a tank that covers the average year can still run empty in August. Check the local rules too: rainwater harvesting is regulated in some states even where it is broadly allowed. The rainwater calculator works from your own roof and rainfall pattern, and lesson three covers why water is chosen before power.

Snow: 32 inches in an average year

At this level, snow is a design input rather than a nuisance. It sets the roof load your structure has to carry, it decides where a metal roof may safely shed and therefore where doors, propane tanks, and walkways must not be, and it buries a ground-mounted array at exactly the time of year the array matters most. It also makes the driveway a system: how it is graded, where the snow is pushed, and who clears it when you cannot.

Distance is part of the plan

Measured straight line from the center of Goshen County: the nearest fire station is about 15.1 miles away (Torrington Volunteer Fire Department), the nearest hospital is about 16.2 miles away (Community Hospital), the nearest supermarket is about 14.6 miles away (Kelly's Super Market). Road miles will be longer, and in winter longer again.

The fire distance is worth noting before you buy rather than at renewal: insurers commonly rate rural property partly on how far it is from a responding station and from a water source, and some decline off-grid or owner-built structures outright. Ask an agent who writes rural policies what they would need to see, while the answer can still change what you build. Lesson eleven covers the insurance and financing side.

The hospital distance sets what your first aid kit and your medical plan have to cover in the gap, and it is the number to think about before anyone in the household depends on refrigerated medication or mains-powered equipment.

Confirming this for your own parcel

The eight topics above are recorded as settled for Goshen County, which is a statement about what public sources say rather than about your parcel. Confirm anyway before you buy: a covenant, an overlay district, a floodplain, or a private road agreement can change the answer on one lot without changing anything at the county level.

Where a topic is recorded as settled here (zoning, what counts as a dwelling, building permits and codes, septic and sewage, greywater, rainwater harvesting, wells and water rights, mandatory utility connection), the source is cited further down this page. Sources go stale, ordinances get amended, and this site logs corrections publicly rather than editing them away, so if you find something here that no longer matches the county, the corrections page is how to say so.

Before any of those calls, walk the parcel with the land walk checklist and take the questions for the county with you. The parcel check pulls flood, wetland, slope, and access data for a specific parcel and shows its sources, which is a good way to arrive at the office with the questions already framed. Lesson two is the wider version of this list.

Looking at a specific parcel in Goshen County, WY?The rules above are the jurisdiction. The land check runs the parcel itself: flood zone, soils and septic suitability, wetlands, slope, access, climate, and these verdicts, from a parcel number or coordinates.
Check a parcel →

Live here? Help keep Goshen County accurate.

Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.

This page is

FAQ

Common questions about off-grid living in Goshen County

Is it legal to live off-grid in Goshen County, Wyoming?

There is no outright ban on living off-grid in Goshen County, Wyoming - it is generally possible. Zoning and land use are generally allowed, putting a cabin, tiny home, or RV on raw land is generally allowed, and building permits are generally allowed. Plan around septic/wastewater (restricted) and disconnecting from utilities (generally allowed). Because these rules are set locally, confirm the specifics with Goshen County before you buy land or build.

Does Goshen County require a building permit for an off-grid cabin?

No. The county's Planning & GIS office confirms Goshen has no building inspections or permitting program at the county level. It just points people to the state-adopted IBC 2024 as reference, not a mandatory requirement.

Can I put a tiny home or RV on my land in Goshen County?

On unincorporated land, yes, since there's no zoning or building code to restrict it. Just check for subdivision covenants, and note that towns like Torrington or Lingle may have their own separate zoning rules.

Do I need a permit to drill a well in Goshen County?

Yes. Every well in Wyoming needs a State Engineer permit before construction starts. In the LaGrange Aquifer area of southern Goshen County, there's also a special order limiting new large-capacity well permits, though small domestic and stock wells are generally exempt.

Is a septic permit required in Goshen County?

Yes. Unlike a handful of Wyoming counties where the state DEQ issues septic permits directly, Goshen County handles its own septic permitting locally through Planning & GIS, using an application built on the state's small wastewater general permit framework.

New here, or not sure where this fits? Start here walks through the whole thing in order.