Off-Grid Living in Dickey County, North Dakota
Dickey County has its own countywide zoning ordinance with a conditional-use permit process for non-standard dwellings, but septic permitting is delegated to the multi-county Central Valley Health District plus state DEQ licensing. Greywater, rainwater, private wells, and utility-disconnection rules aren't confirmed locally, so I'd treat those as inheriting a murky state baseline until you call the relevant office.
Is it legal to live off-grid in Dickey County, North Dakota?
There is no outright ban on living off-grid in Dickey County, North Dakota - it is possible, but the local rules are not all documented online. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are set locally and vary by area. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Dickey County before you buy land or build.
The verdict for Dickey County
- Zoning: Varies locally
- Dwellings, tiny homes: Unclear - verify
- Building permits: Varies locally
- Septic: Generally allowed
- Greywater reuse: Unclear - verify
- Rainwater harvesting: Unclear - verify
- Private wells: Unclear - verify
- Living disconnected from utilities: Unclear - verify
Dickey County at a glance
Who to call in Dickey County
- Building permits Dickey County Building & Zoning
- Other Dickey County Health District / Board of Health
- Septic and health Central Valley Health District, Environmental Health Department
- Septic and health North Dakota Department of Environmental Quality, Water Quality Division 701-328-5237
- Wells and water North Dakota DEQ Municipal Facilities Division
Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.
I've been digging into what it actually takes to live off-grid in Dickey County, North Dakota, and I'll be upfront: this is one of those places where the paper trail is a bit thin in spots, so I'm flagging exactly where I have solid ground and where you'll need to make a phone call yourself.
Zoning comes from the county, not the state. Unlike some rural ND counties that skip zoning altogether, Dickey County has adopted countywide zoning. There's a "2026 Zoning Ordinance" in draft form on the county's official site, along with a dedicated Building and Zoning permits page. If you're looking at raw agricultural land and want to build something unconventional, know that the draft ordinance sets up a Conditional Use Permit process run by the Board of County Commissioners for anything not explicitly allowed in a given zoning district. That's the mechanism you'd likely go through for an off-grid cabin or tiny home on ag land.
On dwellings, tiny homes, and RVs, the draft ordinance does define a "non-farm residence" category for agriculture-zoned parcels, tied to North Dakota Century Code definitions of farming. That tells me the county is watching for non-farm housing on ag land, but I couldn't find a specific minimum square footage rule or an explicit RV-as-permanent-residence policy. Absent county specifics, this likely falls back to whatever the state baseline is, which doesn't set a statewide minimum size, leaving it to local discretion.
Building permits are handled by the county, but North Dakota is a home-rule state, meaning each county decides for itself whether and how to adopt a building code. I couldn't confirm which code edition, if any, Dickey County has adopted, so ask the county's Building and Zoning office directly.
Septic systems are actually not handled by the county alone. Dickey County contracts environmental health work, including septic/OSTS permitting, to the Central Valley Health District (CVHD), which covers eight counties in southeast-central ND. Installers also need a state license from the North Dakota Department of Environmental Quality. So expect two layers: CVHD for the local permit, state DEQ for installer licensing.
Greywater and rainwater harvesting I found nothing county- or district-specific on either topic. Treat both as inheriting whatever the state's general (and honestly murky) baseline is, and don't assume a green light without checking.
Private wells aren't governed by a Dickey County-specific ordinance that I could find. The state's DEQ Municipal Facilities division inspects "community" and "non-community" water systems, and your county health unit may get involved if your well counts as a non-community supply.
Utility disconnection (living without grid power, water, or sewer hookups) doesn't appear to be mandated by any Dickey County ordinance I found. The zoning conditional-use process is probably where any off-grid setup that looks unusual would get evaluated, case by case.
Bottom line: zoning and conditional-use permitting run through the county, septic runs through Central Valley Health District plus state licensing, and quite a bit else (greywater, rainwater, wells, utility hookups) just isn't spelled out locally, so a phone call before you buy or build will save you headaches.
Dickey County in numbers
- Worst-month sun
- 2.9 peak hours/day (4.7 annual average)
- Heating degree days
- 8,591
- Precipitation / snow
- 22.77 in / 43.9 in a year
- Frost-free season
- 05-08 to 09-27
- Elevation
- 1,355 ft
- Hospital
- Jamestown Regional Medical Center · 27.7 mi
Open the full site report for this spot →
30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.
Planning a build in Dickey County
The rules above decide what you may build. The numbers below decide what you will have to build, and they come from this place rather than from a national average.
Solar: size for the worst month, not the average
Dickey County averages 4.7 peak sun hours a day across the year, but its worst month averages 2.9. That is a drop of about 40 percent. An array sized on the annual figure will therefore come up short in the worst month by roughly that much, in the season when lights, pumps, and heating fans all run hardest.
Put another way, meeting the same daily load in the worst month here takes about 1.7 times the array that the annual average implies, or a generator and the fuel budget to run it. Neither is wrong; what is wrong is discovering the gap in the first winter. The solar calculator runs this arithmetic against your own load list, and lesson four covers building that list before buying panels.
Heat: 8,591 heating degree days
That is a severe heating season, where the building envelope matters more than any appliance you can buy. Heating demand at this level dwarfs everything electrical in the house, which is why almost nobody here heats with electricity from a battery bank.
As a rough order of magnitude, a small, reasonably insulated cabin heated mainly with wood in a climate like this tends to burn in the region of 7.2 cords a season, with the real figure swinging widely on insulation, house size, and how you burn. Treat that as a bracket for planning your woodshed rather than a promise, split and stack a season ahead, and check with a moisture meter before burning. The firewood calculator and heat-loss calculator narrow it down from your own building.
Growing season: about 142 frost-free days
Average last frost falls around 05-08 and average first frost around 09-27, which leaves roughly 142 days between them. That figure decides what can be grown outdoors without protection, whether a season extension structure is worth building, and how much of the year food storage has to cover. Averages also hide the frost that arrives two weeks early, so plan the garden on the short end. The garden calculator and food storage calculator work from this number.
Water: what the roof would actually catch
Dickey County receives about 22.8 inches of precipitation a year. A 1,000 square foot roof here would shed on the order of 12,058 gallons a year at a realistic 85 percent collection efficiency, before any losses to first-flush diversion, evaporation, or overflow in a heavy storm.
The annual total is the easy part. What sizes a cistern is the longest dry stretch, because catchment is seasonal almost everywhere and a tank that covers the average year can still run empty in August. Check the local rules too: rainwater harvesting is regulated in some states even where it is broadly allowed. The rainwater calculator works from your own roof and rainfall pattern, and lesson three covers why water is chosen before power.
Snow: 44 inches in an average year
At this level, snow is a design input rather than a nuisance. It sets the roof load your structure has to carry, it decides where a metal roof may safely shed and therefore where doors, propane tanks, and walkways must not be, and it buries a ground-mounted array at exactly the time of year the array matters most. It also makes the driveway a system: how it is graded, where the snow is pushed, and who clears it when you cannot.
Distance is part of the plan
Measured straight line from the center of Dickey County: the nearest hospital is about 27.7 miles away (Jamestown Regional Medical Center). Road miles will be longer, and in winter longer again.
The hospital distance sets what your first aid kit and your medical plan have to cover in the gap, and it is the number to think about before anyone in the household depends on refrigerated medication or mains-powered equipment.
Confirming this for your own parcel
On this page 7 of the eight topics are recorded as unclear or as varying within Dickey County: zoning, what counts as a dwelling, building permits and codes, greywater, rainwater harvesting, wells and water rights, mandatory utility connection. Those are the calls to make first, because they are the ones where a general answer cannot be trusted for a specific parcel. Ask for the answer in writing where the office will give it, and note the name and the date where it will not.
Where a topic is recorded as settled here (septic and sewage), the source is cited further down this page. Sources go stale, ordinances get amended, and this site logs corrections publicly rather than editing them away, so if you find something here that no longer matches the county, the corrections page is how to say so.
Before any of those calls, walk the parcel with the land walk checklist and take the questions for the county with you. The parcel check pulls flood, wetland, slope, and access data for a specific parcel and shows its sources, which is a good way to arrive at the office with the questions already framed. Lesson two is the wider version of this list.
Sources
Primary sources (statutes, agencies, municipal documents)
- 50 Amendment of Chapter 5 Ellendale Revised Ordinances ellendalend.gov
- Septic Systems deq.nd.gov
- Environmental Health and Safety wellscountydistricthealth.org
- Environmental Health - Central Valley Health District centralvalleyhealth.org
- Dickey County Public Health District | Promoting Public Heath in Dickey County, ND dickeycountyhealth.org
- local public health units www.ndhealth.gov
- North Dakota Department of Environmental Quality deq.nd.gov
- NORTH DAKOTA LOCAL PUBLIC HEALTH UNITS January 2023 HEALTH DISTRICT/ www.ndhealth.gov
- Local Public Health | Health and Human Services North Dakota www.hhs.nd.gov
- Municipal Facilities - North Dakota Department of Environmental Quality deq.nd.gov
- 131-059-17BBB - USGS Water Data for the Nation waterdata.usgs.gov
Secondary sources (universities, regional bodies)
- 1'10. 1150 AE-1156 ," •• ~ ,. :l ... s..ov, ,. \''U In library.ndsu.edu
Only government, statute, municipal, university, and regional-planning sources are listed. Pages used to find an issue but not to substantiate it are not cited. See how this database is researched.
Live here? Help keep Dickey County accurate.
Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.
FAQ
Common questions about off-grid living in Dickey County
Is it legal to live off-grid in Dickey County, North Dakota?
There is no outright ban on living off-grid in Dickey County, North Dakota - it is possible, but the local rules are not all documented online. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are set locally and vary by area. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Dickey County before you buy land or build.
Does Dickey County have zoning that affects off-grid living?
Yes. Dickey County has countywide zoning, including a 2026 Zoning Ordinance draft, and any use not explicitly allowed in a zoning district needs a Conditional Use Permit from the Board of County Commissioners.
Who handles septic permits in Dickey County?
The Central Valley Health District, which covers Dickey and seven other counties, handles septic/onsite wastewater permitting, while the state DEQ licenses the installers.
Can I collect rainwater or reuse greywater legally in Dickey County?
I couldn't find a county or state rule directly addressing either practice here, so it's unclear. Best to call Central Valley Health District's Environmental Health Department before setting anything up.
Is there a minimum size for a legal dwelling in Dickey County?
Not that I could confirm. The county's zoning draft defines 'non-farm residence' for ag land but doesn't specify a minimum size, so this likely falls to state baseline rules, which also don't set one.
Do I have to hook up to utilities to live in Dickey County?
I found no ordinance requiring utility hookups. Off-grid power is generally legal statewide, but anything unconventional on ag-zoned land may need to go through the county's conditional-use permit process.
New here, or not sure where this fits? Start here walks through the whole thing in order.
