Start here:System PlannerOne plan for power, heat and waterLand CheckAssess a parcel before you buy itFree CourseOff-grid from zero, in 12 lessons

Off-Grid Laws › Utah

Off-Grid Living in Cache County, Utah

Cache County, Utah is a patchwork of 19 cities plus unincorporated county land, each with separate zoning and building authority, so off-grid rules depend heavily on exactly where your parcel sits. Septic, wells, and rainwater mostly follow state and regional health department baselines, but RV/tiny-home dwelling rules and utility-disconnection requirements aren't clearly spelled out in county sources and need direct confirmation.</summary> <parameter name="framework">{"zoning":{"status":"varies","note":"Cache County Title 17 governs unincorporated areas and requires a Zoning Clearance before building, but each of the 19 incorporated cities has its own zoning rules that override the county's in city limits. No countywide rule on tents/yurts/RVs on raw land was confirmed.","cite":"https://www.cachecounty.gov/pz/"},"dwelling":{"status":"restricted","note":"Manufactured homes are defined and regulated under Cache County zoning, but the county's specific rule on RVs or tiny-homes-on-wheels as dwellings was not confirmed; ask Planning & Zoning directly.","cite":"https://www.cachecounty.gov/assets/department/zoning/code%20amendment/Title17/DefinitionsUsechart/AmendmentsUseChartDefinitionsSB.pdf"},"building":{"status":"restricted","note":"Cache County requires building permits, an approved zoning clearance/site plan, engineered plans for new homes, and (since 2022) a Pre-Occupancy Checklist from Public Works and the Fire District, but only in unincorporated areas; incorporated cities run their own building departments.","cite":"https://www.cachecounty.gov/building/building-permit-applications.html"},"septic":{"status":"restricted","note":"The Bear River Health Department issues septic permits for Cache, Box Elder, and Rich counties based on site and percolation testing; composting toilets as an alternative are not confirmed locally.","cite":"https://brhdut.gov/services/environmental/"},"greywater":{"status":"restricted","note":"No Cache County-specific greywater ordinance was found; the state rule administered through the local health department appears to be the operative baseline.","cite":""},"rainwater":{"status":"permitted","note":"No Cache County restriction on rainwater harvesting was found beyond the state's general allowance.","cite":""},"well":{"status":"restricted","note":"Well permits and water rights go through the Utah Division of Water Rights (State Engineer); the Cache Water District handles regional planning, not individual well permitting.","cite":"https://www.cachewaterdistrict.com/"},"utility":{"status":"unclear","note":"Cache County's Pre-Occupancy Checklist and Certificate of Occupancy process suggest scrutiny before occupancy, but whether grid utility connection is mandatory versus an approved well/septic sufficing is not confirmed; ask the Building Department.","cite":"https://www.cachecounty.gov/engineering/permits/"}}

Is it legal to live off-grid in Cache County, Utah?

There is no outright ban on living off-grid in Cache County, Utah - it is legal but regulated. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is restricted, and building permits are restricted. Plan around septic/wastewater (restricted) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Cache County before you buy land or build.

Read this before you act on anything below. This is my researched starting point for Cache County, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.
Primary-source verified · reviewed Aug 202619 government, statute, or municipal sources are linked below; the verdict card cites them where a match exists.

The verdict for Cache County

  • Zoning: Varies locally
  • Dwellings, tiny homes: Restricted
  • Building permits: Restricted
  • Septic: Restricted
  • Greywater reuse: Restricted
  • Rainwater harvesting: Generally allowed
  • Private wells: Restricted
  • Living disconnected from utilities: Unclear - verify

Cache County at a glance

Zoning & raw-land occupancy
Varies locallyCache County has 19 incorporated municipalities, each with its own zoning and land use rules, so what's allowed on raw land depends heavily on which city or unincorporated area you're in. In unincorporated areas, Cache County's Title 17 zoning code governs and requires a Zoning Clearance before building, but no clear countywide rule on tents, yurts, or living in an RV on raw land was found, so that point is not confirmed and worth a direct call to Planning and Zoning. source
Dwellings, tiny homes & RVs
RestrictedCache County's zoning code defines and regulates manufactured/factory-built housing, and those units have to meet zoning district standards. Whether RVs or tiny homes on wheels can be used as a permanent or temporary dwelling isn't spelled out clearly in Cache County's own code, so I'd confirm directly with the county's Planning and Zoning office before counting on it. source
Building permits & codes
RestrictedA permit is required for new homes, additions, sheds over 200 square feet, shops, garages, and commercial construction, and you need an approved Zoning Clearance and Site Plan before a building permit is issued. Cache County only issues permits for unincorporated land, since each incorporated city runs its own building department, and since January 2022 unincorporated construction also needs a Pre-Occupancy Checklist signed off by Public Works and the Fire District before you can move in. source
Septic & composting toilets
RestrictedThe Bear River Health Department handles septic permitting for Cache, Box Elder, and Rich counties, and any new or altered septic system needs a permit based on soil conditions, site plan, and a percolation test. Composting toilets aren't specifically addressed in the Cache County sources I found, so whether they're accepted as an alternative is not confirmed, this would default to the state's general septic rules unless the health department says otherwise. source
Greywater reuse
RestrictedI couldn't find a Cache County or Bear River Health Department page specifically addressing greywater permitting, so it appears the county just defers to the state rule under Utah Admin. Code R317-401. Whether the health department has its own additional greywater procedures beyond that state baseline is not confirmed, so check with Bear River Health Department directly.
Rainwater harvesting
Generally allowedThere's no Cache County ordinance found that restricts or changes the state's rainwater harvesting allowance under Utah Code 73-3-1.5, so the county appears to simply follow the statewide rule with no extra local permitting layer.
Private wells & water rights
RestrictedWell drilling permits and water rights filings in Cache County go through the state, via the Utah Division of Water Rights (State Engineer), not through any county office. The Cache Water District handles long-term water planning and conservation policy for the county but isn't the permitting authority for an individual well.
Living disconnected from utilities
Unclear - verifyCache County's Pre-Occupancy Checklist and Certificate of Occupancy process, run through Public Works and the Fire District, suggest all permit conditions must be met before you can occupy a structure, but whether that specifically forces a grid utility or sewer hookup versus accepting an approved well and septic system in lieu of hookup is not confirmed in the sources I reviewed. I'd call the Cache County Building Department directly to get a straight answer before planning a fully off-grid setup. source

Who to call in Cache County

Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.

If you're eyeing off-grid land in Cache County, Utah, the first thing I have to tell you is that this county is a patchwork. There are 19 incorporated cities inside Cache County, each running its own zoning and building department, and Cache County's own rules (Title 17 for zoning) only apply out in the unincorporated pockets. So step one, always, is figuring out whether your parcel sits in a city or in unincorporated county land, because that determines who you're calling.

Zoning and raw land. For unincorporated parcels, the Cache County Planning and Zoning Division handles zoning clearance and can tell you what's allowed on a given parcel. I didn't find a countywide rule spelling out whether you can simply live in a tent, yurt, or RV on raw land long-term, so that's a direct question for that office rather than something I can confirm from published code.

Dwellings, tiny homes, RVs. Cache County's zoning code does define and regulate manufactured/factory-built housing, so a manufactured home has a real legal pathway. But I could not confirm Cache County's specific rule on living in an RV or tiny-home-on-wheels as a residence. Neighboring Utah counties often require Planning Commission approval, utility/septic plans, and limits on how long you can occupy an RV as a home, which gives a sense of the pattern Utah counties tend to follow, but you'd need Cache County Planning & Zoning to confirm their exact approach.

Building permits. The county requires permits for new homes, additions, sheds over a certain size, shops, and garages, and requires an approved zoning clearance and site plan before a building permit is issued. New single-family dwellings need engineered plans. Notably, since January 2022, unincorporated Cache County has required a Pre-Occupancy Checklist signed off by Public Works and the Fire District before you get a Certificate of Occupancy. Incorporated cities run their own building departments, so if you're inside a city, this county process doesn't apply to you at all.

Septic and composting toilets. The Bear River Health Department, which covers Cache, Box Elder, and Rich counties, issues septic permits and requires a percolation test and site evaluation. I did not find anything specifically addressing composting toilets as an accepted alternative in Cache County, so that would fall back to the state's baseline health code, and I'd confirm directly with Bear River Health.

Greywater and rainwater. No Cache County-specific greywater ordinance turned up in my research, so this appears to default to the state rule administered through Bear River Health. Rainwater harvesting looks similarly unrestricted beyond the state's general allowance, with no added county permitting layer that I could find.

Wells and water rights. Well drilling and water rights filings go through the Utah Division of Water Rights (State Engineer), not the county. The Cache Water District exists for regional water planning and conservation, not for issuing individual well permits.

Utility disconnection. Cache County's Pre-Occupancy Checklist and Certificate of Occupancy process suggest some level of scrutiny before a home is cleared for use, but whether that requires grid utility hookup versus accepting an approved well and septic system instead is something I couldn't confirm from published sources. Ask the Building Department directly before you plan around going fully disconnected.

Cache County in numbers

Worst-month sun
3.1 peak hours/day (5.2 annual average)
Heating degree days
6,761
Precipitation / snow
19.74 in / 63.1 in a year
Elevation
4,515 ft
Supermarket
Natural Grocers · 0.0 mi
Fire station
Logan City Fire Department Station 70 · 1.1 mi
Hardware
Industrial Tool & Supply · 0.3 mi
Hospital
Logan Regional Hospital · 0.8 mi

Open the full site report for this spot →

30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.

Planning a build in Cache County

The rules above decide what you may build. The numbers below decide what you will have to build, and they come from this place rather than from a national average.

Solar: size for the worst month, not the average

Cache County averages 5.2 peak sun hours a day across the year, but its worst month averages 3.1. That is a drop of about 40 percent. An array sized on the annual figure will therefore come up short in the worst month by roughly that much, in the season when lights, pumps, and heating fans all run hardest.

Put another way, meeting the same daily load in the worst month here takes about 1.7 times the array that the annual average implies, or a generator and the fuel budget to run it. Neither is wrong; what is wrong is discovering the gap in the first winter. The solar calculator runs this arithmetic against your own load list, and lesson four covers building that list before buying panels.

Heat: 6,761 heating degree days

That is a genuinely cold heating season, where losing heat for a few days in winter risks the plumbing and the building itself. Heating demand at this level dwarfs everything electrical in the house, which is why almost nobody here heats with electricity from a battery bank.

As a rough order of magnitude, a small, reasonably insulated cabin heated mainly with wood in a climate like this tends to burn in the region of 5.6 cords a season, with the real figure swinging widely on insulation, house size, and how you burn. Treat that as a bracket for planning your woodshed rather than a promise, split and stack a season ahead, and check with a moisture meter before burning. The firewood calculator and heat-loss calculator narrow it down from your own building.

Water: what the roof would actually catch

Cache County receives about 19.7 inches of precipitation a year. A 1,000 square foot roof here would shed on the order of 10,453 gallons a year at a realistic 85 percent collection efficiency, before any losses to first-flush diversion, evaporation, or overflow in a heavy storm.

The annual total is the easy part. What sizes a cistern is the longest dry stretch, because catchment is seasonal almost everywhere and a tank that covers the average year can still run empty in August. Check the local rules too: rainwater harvesting is regulated in some states even where it is broadly allowed. The rainwater calculator works from your own roof and rainfall pattern, and lesson three covers why water is chosen before power.

Snow: 63 inches in an average year

At this level, snow is a design input rather than a nuisance. It sets the roof load your structure has to carry, it decides where a metal roof may safely shed and therefore where doors, propane tanks, and walkways must not be, and it buries a ground-mounted array at exactly the time of year the array matters most. It also makes the driveway a system: how it is graded, where the snow is pushed, and who clears it when you cannot.

Distance is part of the plan

Measured straight line from the center of Cache County: the nearest fire station is about 1.1 miles away (Logan City Fire Department Station 70), the nearest hospital is about 0.8 miles away (Logan Regional Hospital), the nearest supermarket is about 0.0 miles away (Natural Grocers). Road miles will be longer, and in winter longer again.

The fire distance is worth noting before you buy rather than at renewal: insurers commonly rate rural property partly on how far it is from a responding station and from a water source, and some decline off-grid or owner-built structures outright. Ask an agent who writes rural policies what they would need to see, while the answer can still change what you build. Lesson eleven covers the insurance and financing side.

The hospital distance sets what your first aid kit and your medical plan have to cover in the gap, and it is the number to think about before anyone in the household depends on refrigerated medication or mains-powered equipment.

Confirming this for your own parcel

On this page 2 of the eight topics are recorded as unclear or as varying within Cache County: zoning, mandatory utility connection. Those are the calls to make first, because they are the ones where a general answer cannot be trusted for a specific parcel. Ask for the answer in writing where the office will give it, and note the name and the date where it will not.

Where a topic is recorded as settled here (what counts as a dwelling, building permits and codes, septic and sewage, greywater, rainwater harvesting, wells and water rights), the source is cited further down this page. Sources go stale, ordinances get amended, and this site logs corrections publicly rather than editing them away, so if you find something here that no longer matches the county, the corrections page is how to say so.

Before any of those calls, walk the parcel with the land walk checklist and take the questions for the county with you. The parcel check pulls flood, wetland, slope, and access data for a specific parcel and shows its sources, which is a good way to arrive at the office with the questions already framed. Lesson two is the wider version of this list.

Looking at a specific parcel in Cache County, UT?The rules above are the jurisdiction. The land check runs the parcel itself: flood zone, soils and septic suitability, wetlands, slope, access, climate, and these verdicts, from a parcel number or coordinates.
Check a parcel →

Sources

Primary sources (statutes, agencies, municipal documents)

Secondary sources (universities, regional bodies)

Only government, statute, municipal, university, and regional-planning sources are listed. Pages used to find an issue but not to substantiate it are not cited. See how this database is researched.

Live here? Help keep Cache County accurate.

Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.

This page is

FAQ

Common questions about off-grid living in Cache County

Is it legal to live off-grid in Cache County, Utah?

There is no outright ban on living off-grid in Cache County, Utah - it is legal but regulated. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is restricted, and building permits are restricted. Plan around septic/wastewater (restricted) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Cache County before you buy land or build.

Does Cache County allow you to live in an RV or tiny home on your own land?

I couldn't confirm a specific Cache County ordinance on this. Manufactured homes have a defined pathway under county zoning, but RV or tiny-home-on-wheels occupancy rules aren't spelled out in the sources I reviewed, so you'd need to ask Cache County Planning & Zoning directly, and check with your city if you're inside incorporated limits.

Who issues septic permits in Cache County?

The Bear River Health Department, which covers Cache, Box Elder, and Rich counties, handles septic permitting based on site and soil percolation testing.

Can I drill my own well in Cache County?

Well permits and water rights are handled by the Utah Division of Water Rights (State Engineer), a state authority, not the county. The Cache Water District only handles regional water planning.

Does living in unincorporated Cache County mean fewer building rules than in a city?

Not necessarily fewer, just different. Unincorporated areas fall under Cache County's own building department and its 2022 Pre-Occupancy Checklist requirement, while each of the 19 cities in the county has its own separate building department and code.

New here, or not sure where this fits? Start here walks through the whole thing in order.