Off-Grid Living in Union County, Pennsylvania
Union County, PA has no countywide zoning ordinance, so whether you need a zoning permit, and what setbacks apply, depends entirely on your township or borough. Building permits run through CKCOG under the state Uniform Construction Code, and septic is permitted locally by municipal Sewage Enforcement Officers rather than a county health department.
Is it legal to live off-grid in Union County, Pennsylvania?
There is no outright ban on living off-grid in Union County, Pennsylvania - it is legal but regulated. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are restricted. Plan around septic/wastewater (restricted) and disconnecting from utilities (set locally and vary by area). Because these rules are set locally, confirm the specifics with Union County before you buy land or build.
The verdict for Union County
- Zoning: Varies locally
- Dwellings, tiny homes: Unclear - verify
- Building permits: Restricted
- Septic: Restricted
- Greywater reuse: Restricted
- Rainwater harvesting: Generally allowed
- Private wells: Generally allowed
- Living disconnected from utilities: Varies locally
Union County at a glance
Who to call in Union County
- Planning Union County Planning & Economic Development Department (570) 524-3840
- Building permits Central Keystone Council of Governments (CKCOG) (570) 522-1322
- Zoning Buffalo Township Planning & Zoning
- Environmental Union County Conservation District (570) 524-3860
Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.
I'll be straight with you: Union County, Pennsylvania is one of those places where the county name on the map doesn't tell you much about the actual rules. There's no countywide zoning ordinance here. Zoning is set township-by-township and borough-by-borough, so what applies in Buffalo Township may not apply two miles away in Union Township. I'm laying out what I found, but you'll need to confirm with your specific municipality before you buy land or start building.
Zoning first. Union County Planning & Economic Development Department (the county's planning arm) plays an advisory role only, mostly on comprehensive planning and sustaining the county's rural character. It doesn't issue zoning permits itself, except as a fallback contact if your township has no zoning officer. From what I found: Buffalo Township, East Buffalo Township, West Buffalo Township, and Lewis Township require a zoning permit. Union Township and Limestone Township do not require one, but both still enforce property line setbacks. So "no permit needed" doesn't mean "no rules" - always check setbacks with the township office.
Building permits run through the Central Keystone Council of Governments (CKCOG), a multi-county body that administers Pennsylvania's Uniform Construction Code (UCC) instead of a single Union County building department. If you're building, enlarging, moving, or changing occupancy of a dwelling or accessory structure, you generally need a UCC permit, and zoning approval has to happen first. Some agricultural buildings, like chicken coops or ag storage, are exempt from the UCC permit but still need an Agricultural Building Exemption Form and may need other local approvals.
Septic is handled by municipally-appointed Sewage Enforcement Officers (SEOs), not a county health department, because Union County doesn't have one. You can't occupy a structure until your on-lot sewage system is inspected, approved, and covered by the SEO. Permits also expire if you don't start construction within a set window after issuance, so don't pull a permit too early.
Greywater isn't addressed separately at the county or (as far as I found) municipal level. It falls under the same state Sewage Facilities Act framework as septic, meaning you'd go through the local SEO.
Rainwater harvesting for non-potable use appears unregulated at the county and township level, going by state baseline rules, but I didn't find a specific local ordinance either way.
Wells don't have a separate county permitting layer that I found. The Union County Conservation District's role is mostly around erosion control and streambank/wetland work (Chapter 102/105), not well drilling itself, which falls under the statewide driller-licensing framework.
Utility disconnection (living off-grid without hookups) isn't addressed at the county level at all - if a township requires grid connection as a condition of occupancy, that would show up in that specific municipality's ordinance, not a county rule.
Bottom line: in Union County, the township or borough office is your first call, every single time.
Union County in numbers
- Worst-month sun
- 3.3 peak hours/day (4.8 annual average)
- Heating degree days
- 5,530
- Precipitation / snow
- 46.17 in / 19.4 in a year
- Elevation
- 459 ft
- Fire station
- Union Fire Company #1 · 5.8 mi
- Supermarket
- Redner's · 5.5 mi
- Hardware
- Georgetown Hydraulics · 7.0 mi
- Hospital
- Upper Chesapeake Hospital · 26.9 mi
Open the full site report for this spot →
30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.
Planning a build in Union County
The rules above decide what you may build. The numbers below decide what you will have to build, and they come from this place rather than from a national average.
Solar: size for the worst month, not the average
Union County averages 4.8 peak sun hours a day across the year, but its worst month averages 3.3. That is a drop of about 31 percent. An array sized on the annual figure will therefore come up short in the worst month by roughly that much, in the season when lights, pumps, and heating fans all run hardest.
Put another way, meeting the same daily load in the worst month here takes about 1.5 times the array that the annual average implies, or a generator and the fuel budget to run it. Neither is wrong; what is wrong is discovering the gap in the first winter. The solar calculator runs this arithmetic against your own load list, and lesson four covers building that list before buying panels.
Heat: 5,530 heating degree days
That is a cold-climate heating season, where the fuel supply is a year-round job and a second heat source earns its keep. Heating demand at this level dwarfs everything electrical in the house, which is why almost nobody here heats with electricity from a battery bank.
As a rough order of magnitude, a small, reasonably insulated cabin heated mainly with wood in a climate like this tends to burn in the region of 4.6 cords a season, with the real figure swinging widely on insulation, house size, and how you burn. Treat that as a bracket for planning your woodshed rather than a promise, split and stack a season ahead, and check with a moisture meter before burning. The firewood calculator and heat-loss calculator narrow it down from your own building.
Water: what the roof would actually catch
Union County receives about 46.2 inches of precipitation a year. A 1,000 square foot roof here would shed on the order of 24,449 gallons a year at a realistic 85 percent collection efficiency, before any losses to first-flush diversion, evaporation, or overflow in a heavy storm.
The annual total is the easy part. What sizes a cistern is the longest dry stretch, because catchment is seasonal almost everywhere and a tank that covers the average year can still run empty in August. Check the local rules too: rainwater harvesting is regulated in some states even where it is broadly allowed. The rainwater calculator works from your own roof and rainfall pattern, and lesson three covers why water is chosen before power.
Snow: 19 inches in an average year
At this level, snow is a design input rather than a nuisance. It sets the roof load your structure has to carry, it decides where a metal roof may safely shed and therefore where doors, propane tanks, and walkways must not be, and it buries a ground-mounted array at exactly the time of year the array matters most. It also makes the driveway a system: how it is graded, where the snow is pushed, and who clears it when you cannot.
Distance is part of the plan
Measured straight line from the center of Union County: the nearest fire station is about 5.8 miles away (Union Fire Company #1), the nearest hospital is about 26.9 miles away (Upper Chesapeake Hospital), the nearest supermarket is about 5.5 miles away (Redner's). Road miles will be longer, and in winter longer again.
The fire distance is worth noting before you buy rather than at renewal: insurers commonly rate rural property partly on how far it is from a responding station and from a water source, and some decline off-grid or owner-built structures outright. Ask an agent who writes rural policies what they would need to see, while the answer can still change what you build. Lesson eleven covers the insurance and financing side.
The hospital distance sets what your first aid kit and your medical plan have to cover in the gap, and it is the number to think about before anyone in the household depends on refrigerated medication or mains-powered equipment.
Confirming this for your own parcel
On this page 3 of the eight topics are recorded as unclear or as varying within Union County: zoning, what counts as a dwelling, mandatory utility connection. Those are the calls to make first, because they are the ones where a general answer cannot be trusted for a specific parcel. Ask for the answer in writing where the office will give it, and note the name and the date where it will not.
Where a topic is recorded as settled here (building permits and codes, septic and sewage, greywater, rainwater harvesting, wells and water rights), the source is cited further down this page. Sources go stale, ordinances get amended, and this site logs corrections publicly rather than editing them away, so if you find something here that no longer matches the county, the corrections page is how to say so.
Before any of those calls, walk the parcel with the land walk checklist and take the questions for the county with you. The parcel check pulls flood, wetland, slope, and access data for a specific parcel and shows its sources, which is a good way to arrive at the office with the questions already framed. Lesson two is the wider version of this list.
Sources
Primary sources (statutes, agencies, municipal documents)
- Planning Commission | Union County Commissioners www.unioncountypa.org
- Planning Commission Board - Union County, Pennsylvania unioncountypa.org
- Planning Projects & Services | Union County Commissioners www.unioncountypa.org
- Zoning Information | Union County Commissioners www.unioncountypa.org
- Article IV: On-Lot Sewage Disposal System Management - Township of Union, PA ecode360.com
- 25 Pa. Code Chapter 73. Standards For Onlot Sewage Treatment Facilities www.pacodeandbulletin.gov
- General Permits & Forms - Union County, Pennsylvania unioncountypa.org
- Program & Services - Union County, Pennsylvania unioncountypa.org
- Conservation District - Union County, Pennsylvania unioncountypa.org
- Links | Union County Commissioners www.unioncountypa.org
- Links - Union County, Pennsylvania unioncountypa.org
- Program & Services | Union County Commissioners www.unioncountypa.org
Only government, statute, municipal, university, and regional-planning sources are listed. Pages used to find an issue but not to substantiate it are not cited. See how this database is researched.
Live here? Help keep Union County accurate.
Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.
FAQ
Common questions about off-grid living in Union County
Is it legal to live off-grid in Union County, Pennsylvania?
There is no outright ban on living off-grid in Union County, Pennsylvania - it is legal but regulated. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are restricted. Plan around septic/wastewater (restricted) and disconnecting from utilities (set locally and vary by area). Because these rules are set locally, confirm the specifics with Union County before you buy land or build.
Does Union County, PA have a countywide zoning ordinance?
No. Union County has no countywide zoning ordinance. Zoning is set by each individual township or borough, so requirements differ depending on where in the county your land sits.
Who issues building permits in Union County?
Building permits under Pennsylvania's Uniform Construction Code are administered through the Central Keystone Council of Governments (CKCOG), a multi-county code enforcement body, rather than a single Union County building department.
Who handles septic permits since there's no county health department?
Septic (on-lot sewage) permits are issued by Sewage Enforcement Officers appointed at the municipal level, under the state Sewage Facilities Act, since Union County itself has no health department.
Can I build off-grid without connecting to utilities in Union County?
That depends entirely on your specific township or borough's zoning and building ordinances, since there's no countywide rule addressing utility connection as a condition of occupancy.