Off-Grid Laws › Maine › Penobscot County
Off-Grid Living in Drew, Maine
Drew, Maine deorganized in 2023, so there's no town zoning or building department; the state's Land Use Planning Commission and Maine CDC's wastewater program now handle permitting. Off-grid basics like septic, greywater, and wells follow statewide rules, while rainwater harvesting and utility disconnection rules are unconfirmed for this area.
Is it legal to live off-grid in Drew, Maine?
There is no outright ban on living off-grid in Drew, Maine - it is generally possible. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are generally allowed. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Drew before you buy land or build.
The verdict for Drew
- Zoning: Varies locally
- Dwellings, tiny homes: Unclear - verify
- Building permits: Generally allowed
- Septic: Generally allowed
- Greywater reuse: Generally allowed
- Rainwater harvesting: Unclear - verify
- Private wells: Generally allowed
- Living disconnected from utilities: Unclear - verify
Drew at a glance
Who to call in Drew
- Zoning Maine Land Use Planning Commission (LUPC)
- Building permits LUPC Regional Office serving Penobscot County townships
- Septic and health Maine CDC Subsurface Wastewater Program
- Other Penobscot County Commissioners' Office
Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.
Drew is a peculiar case for anyone researching off-grid rules in Maine, because Drew as a self-governing town essentially doesn't exist anymore. It was a plantation that went through de-organization in 2023, and it's now folded into a newly contiguous unorganized territory alongside Kingman and Prentiss. That matters enormously for off-grid living, because it means there's no town zoning ordinance, no local planning board, and no code enforcement officer to call. Instead, land use authority sits with the State of Maine's Land Use Planning Commission, known as LUPC, which handles planning and permitting for unorganized and deorganized territories statewide.
Zoning and raw land. LUPC's district maps, not a town ordinance, control what you can do with land in Drew. LUPC issues permits for construction projects, including home builds and camp renovations, based on the land use district your parcel falls in. I'd treat this as a "varies by district" situation, and you'd need to check with LUPC directly on your specific parcel.
Dwellings, tiny homes, RVs. I didn't find a distinct LUPC category for tiny homes or RVs used as dwellings. Structures are permitted case-by-case, with LUPC setting setbacks, dimensions, and height limits in each issued permit. Whether a seasonal-vs-permanent dwelling distinction under state building code (MUBEC) applies here isn't confirmed, so ask LUPC directly.
Building permits. You will need an LUPC building permit for new construction. Permits I reviewed show conditions requiring compliance with the state's wastewater program, a driveway entrance permit from Maine DOT, and a physical E-911 address from Penobscot County. Construction has to get started and finished within timeframes set in the permit itself, and those vary by permit, so don't assume any specific deadline without checking your paperwork.
Septic and composting toilets. These are permitted under the statewide Subsurface Wastewater Disposal Rules, administered by Maine's CDC Subsurface Wastewater Program. Because Drew has no town health officer, this state process is the only layer you're dealing with, alongside whatever a Licensed Site Evaluator recommends for your site.
Greywater. Same state process as septic, run through the Subsurface Wastewater Program, with no town-level add-on since Drew doesn't administer its own rules anymore.
Rainwater harvesting. I couldn't find any LUPC or state provision addressing this directly for Drew. Treat it as unconfirmed and ask LUPC or the state wastewater program if you have specific plans.
Wells. Private wells fall under the state's Water Well Commission rules, same as anywhere else in Maine, with no extra Drew-specific layer.
Utilities. I found nothing that mandates hookups to grid utilities. LUPC's building permit conditions focus on wastewater and access, not electrical or utility connections, but this isn't explicitly addressed either way in what I reviewed.
Bottom line: anyone looking at land in Drew should expect to deal directly with the state, not a town hall, for essentially every off-grid question.
Drew in numbers
- Worst-month sun
- 2.8 peak hours/day (4.5 annual average)
- Heating degree days
- 8,751
- Precipitation / snow
- 44.57 in / 95.6 in a year
- Frost-free season
- 05-19 to 09-27
- Elevation
- 322 ft
Open the full site report for this spot →
30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.
Sources
Primary sources (statutes, agencies, municipal documents)
- Drew Plantation ME - Maine www.citydirectory.us
- STATE OF MAINE legislature.maine.gov
- Drew Plantation | View - Digital Archives - Maine.gov digitalarchives.maine.gov
- Drew Plt (Penobscot County) | MPUC www.maine.gov
- 1 State Level Laws that Impact Zoning and Land Use in Maine legislature.maine.gov
- MAINE LAND USE PLANNING COMMISSION BP 17709-A LUPC Decision & Conditions www.maine.gov
- MAINE LAND USE PLANNING COMMISSION BP 12893-A LUPC Decision & Conditions www.maine.gov
- MAINE LAND USE PLANNING COMMISSION BP 17742 LUPC Decision & Conditions www.maine.gov
- MAINE LAND USE PLANNING COMMISSION BP 16707 LUPC Decision & Conditions www.maine.gov
- MAINE LAND USE PLANNING COMMISSION BP 16655 LUPC Decision & Conditions www.maine.gov
- MAINE LAND USE PLANNING COMMISSION BP 17844 LUPC Decision & Conditions www.maine.gov
- MAINE LAND USE PLANNING COMMISSION BP 17462-A LUPC Decision & Conditions www.maine.gov
- Subdivision Permit Application Land Use Planning Commission www.maine.gov
- https://www.maine.gov/dacf/lupc/ www.maine.gov
Only government, statute, municipal, university, and regional-planning sources are listed. Pages used to find an issue but not to substantiate it are not cited. See how this database is researched.
Live here? Help keep Drew accurate.
Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.
FAQ
Common questions about off-grid living in Drew
Is it legal to live off-grid in Drew, Maine?
There is no outright ban on living off-grid in Drew, Maine - it is generally possible. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are generally allowed. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Drew before you buy land or build.
Is there a town hall or zoning office in Drew, Maine I can call?
No. Drew deorganized in 2023 and no longer has its own town government, so there's no clerk, zoning administrator, or building inspector for the town itself. All land use and building permit functions moved to the state's Land Use Planning Commission.
Do I need a permit to build an off-grid cabin in Drew?
Yes, you'd need a building permit from the Maine Land Use Planning Commission rather than a town, and that permit will reference compliance with state wastewater rules, a driveway entrance permit, and an E-911 address from Penobscot County.
Can I collect rainwater or dig my own well in Drew?
Wells are permitted under Maine's statewide Water Well Commission rules. Rainwater harvesting isn't clearly addressed in any LUPC or state document I found, so I'd confirm directly with LUPC before relying on it.
