38.0709, -97.8943 · 1,549 ft elevationRead this before you act on anything below. This is my researched starting point for Reno County, KS, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.
The local rulesReno County, KS
Zoning & raw-land occupancy
RestrictedReno County has adopted countywide zoning administered by Planning & Zoning; a zoning permit is required for new construction except structures 120 sq ft or less, and floodplain structures always need a floodplain development permit. source
Dwellings, tiny homes & RVs
Unclear - verifyGeneral zoning permit rules apply to dwellings, but the county's specific standards for tiny homes and whether RVs can be permanent residences outside a park were not confirmed; ask Planning & Zoning directly. source
Building permits & codes
RestrictedReno County requires building/zoning permits administered by Planning & Zoning and Public Works, but the exact adopted building code edition was not confirmed from an official county page. source
Septic & composting toilets
RestrictedReno County's own Sanitation Code (effective Feb. 2024) requires a permit before constructing or modifying any private wastewater system, sets setback distances, and requires inspection before use; composting toilets aren't separately addressed but likely fall under general wastewater rules. source
Greywater reuse
Unclear - verifyNo dedicated Reno County greywater ordinance was found; greywater likely falls under the Sanitation Code's broader wastewater system permitting, but this is not confirmed.
Rainwater harvesting
Unclear - verifyNo Reno County-specific rainwater ordinance was found; it likely inherits the state's generally permissive baseline, but this is not confirmed at the county level.
Private wells & water rights
RestrictedReno County's Environmental Division requires a permit before well construction under the Sanitation Code, layered on state KDHE well-construction standards; KDHE has flagged Reno County as having some groundwater contamination sites requiring extra caution. source
Living disconnected from utilities
Unclear - verifyNo Reno County rule was found mandating hookup to public power, water, or sewer, but self-supplied well and septic systems still require permits and inspections regardless of grid connection.
Sun30-year normals
- Peak-sun hours, annual average
- 5.5 hrs/day
- Worst month (sizes an off-grid array)
- 4.3 hrs/day
- Yearly output per 1 kW of panels
- 1,577 kWh
JFMAMJJASOND
Weather1991-2020
- Precipitation
- 32 in/yr
- Heating degree days
- 5,077 (moderate)
- Frost-free season
- Apr 15 to Oct 21
How far help isstraight-line
- Hospital
Hutchinson Regional Medical Center - 0.5 mi
- Fire station
Hutchinson Fire Department Station 4 - 0.6 mi
- Hardware store
Harbor Freight Tools - 0.2 mi
- Grocery
Walmart Supercenter - 0.1 mi
From OpenStreetMap. Road miles will be longer, often much longer in hill country.
Plan this spot
These open with this location's real numbers already filled in (ZIP 67501).
Size a solar systemHeat loss & insulationFirewood per winterRainwater harvestGarden sizePanel tilt
Share or save this report:New report
Sources: US Census Bureau geocoder; NLR PVWatts v8 (solar); NOAA NCEI 1991-2020 climate normals (nearest station) or Open-Meteo (ZIP-centroid) for weather; Open-Elevation; OpenStreetMap contributors. Public data retrieved Aug 22, 2026; agencies update their layers on their own schedules. Planning data, not a survey or legal advice.