43.8195, -84.7686 · 840 ft elevationRead this before you act on anything below. This is my researched starting point for Clare County, MI, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.
The local rulesClare County, MI
Zoning & raw-land occupancy
Varies locallyClare County has no countywide zoning ordinance; each township and the City of Clare set their own rules, so you must confirm with the specific local jurisdiction covering your parcel. source
Dwellings, tiny homes & RVs
Unclear - verifyNo Clare County or township-specific rule on tiny homes or RV dwelling was found; any dwelling still needs county construction-code permits after local zoning approval. Ask your township zoning administrator about RV occupancy and hookup rules directly. source
Building permits & codes
RestrictedClare County Community Development administers Michigan's Construction Codes and issues building, electrical, plumbing, and mechanical permits for the City of Clare and participating townships countywide. source
Septic & composting toilets
RestrictedThe Central Michigan District Health Department (CMDHD) requires a septic permit before a building permit can be issued, and building without one is a sanitary code violation; no composting-toilet-specific policy was found. source
Greywater reuse
Generally allowedNo Clare County or CMDHD-specific greywater rule was found; this appears to fall back to the statewide Michigan Plumbing Code baseline.
Rainwater harvesting
Generally allowedNo Clare County-specific rainwater harvesting rule was found; this appears to follow the state baseline with no local restriction identified.
Private wells & water rights
Generally allowedCMDHD requires permits and conducts inspections for private wells under state and local sanitary code; large-quantity irrigation wells of 75 gallons per minute or more also need EGLE registration.
Living disconnected from utilities
Unclear - verifyNo explicit ban on full utility disconnection was found, but obtaining a county building permit in practice requires an approved well and septic setup, which acts as a gatekeeper for off-grid properties.
Sun30-year normals
- Peak-sun hours, annual average
- 4.3 hrs/day
- Worst month (sizes an off-grid array)
- 2.0 hrs/day
- Yearly output per 1 kW of panels
- 1,246 kWh
JFMAMJJASOND
Weather1991-2020
- Precipitation
- 32 in/yr
- Snowfall
- 36 in/yr
- Heating degree days
- 7,210 (cold)
- Frost-free season
- Apr 29 to Oct 26
- Design low
- -9 °F
How far help isstraight-line
- Hospital
MyMichigan Medical Center Clare - 0.1 mi
- Fire station
Isabella North-East Fire District - 8.1 mi
- Hardware store
Ace Hardware of Clare - 1.3 mi
- Grocery
Witbeck's Family Foods - 0.4 mi
From OpenStreetMap. Road miles will be longer, often much longer in hill country.
Plan this spot
These open with this location's real numbers already filled in (ZIP 48617).
Size a solar systemHeat loss & insulationFirewood per winterRainwater harvestGarden sizePanel tilt
Share or save this report:New report
Sources: US Census Bureau geocoder; NLR PVWatts v8 (solar); NOAA NCEI 1991-2020 climate normals (nearest station) or Open-Meteo (ZIP-centroid) for weather; Open-Elevation; OpenStreetMap contributors. Public data retrieved Aug 22, 2026; agencies update their layers on their own schedules. Planning data, not a survey or legal advice.