48.1549, -101.1618 · 1,578 ft elevationRead this before you act on anything below. This is my researched starting point for Ward County, ND, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.
The local rulesWard County, ND
Zoning & raw-land occupancy
Varies locallyWard County has countywide zoning with districts like Agricultural Production, Rural Residential, and others, adopted under state law (NDCC 11-33.2-12). Some townships/cities set their own zoning instead, so confirm jurisdiction with Ward County Planning & Zoning. source
Dwellings, tiny homes & RVs
Unclear - verifyNo official Ward County document specifies a minimum dwelling size or a tiny-home/RV occupancy rule; contact Planning & Zoning directly to confirm.
Building permits & codes
RestrictedWard County requires building permits reviewed by its Planning, Building, and Engineering Departments, and First District Health Unit approval for sewer/water is required unless connected to municipal service. source
Septic & composting toilets
Generally allowedSeptic permitting is handled by the First District Health Unit, a regional public health district covering Ward County; a permit is required before work, and a final inspection is mandatory or the system is considered illegal. Composting toilets aren't specifically addressed.
Greywater reuse
Unclear - verifyNo official Ward County or First District Health Unit page addresses greywater reuse specifically; not confirmed, so ask FDHU or the county Building Inspector directly.
Rainwater harvesting
Unclear - verifyNo Ward County-specific rule on rainwater harvesting was found; the state baseline is understood to permit it, but confirm with the county Building Inspector if a storage structure needs a permit.
Private wells & water rights
Generally allowedDomestic wells are generally exempt from full state appropriation permitting, but must be built by a licensed driller; larger or permanent water projects need a conditional water permit from the North Dakota Department of Water Resources, and Ward County falls under the Souris River Joint Board's watershed oversight. source
Living disconnected from utilities
Varies locallyNo countywide rule mandating grid-electric hookup was found, but off-grid water/sewer systems still must go through the same First District Health Unit and county approval process as connected systems; townships/cities may add their own utility rules. source
Sun30-year normals
- Peak-sun hours, annual average
- 4.6 hrs/day
- Worst month (sizes an off-grid array)
- 2.4 hrs/day
- Yearly output per 1 kW of panels
- 1,340 kWh
JFMAMJJASOND
Weather1991-2020
- Precipitation
- 17 in/yr
- Snowfall
- 46 in/yr
- Heating degree days
- 8,800 (severe)
- Frost-free season
- May 10 to Sep 29
How far help isstraight-line
- Hospital
Trinity Health West - 8.1 mi
- Fire station
Minot Fire Department - 7.6 mi
- Hardware store
The Home Depot - 6.8 mi
- Grocery
Walmart Supercenter - 6.9 mi
From OpenStreetMap. Road miles will be longer, often much longer in hill country.
Plan this spot
These open with this location's real numbers already filled in (ZIP 58785).
Size a solar systemHeat loss & insulationFirewood per winterRainwater harvestGarden sizePanel tilt
Share or save this report:New report
Sources: US Census Bureau geocoder; NLR PVWatts v8 (solar); NOAA NCEI 1991-2020 climate normals (nearest station) or Open-Meteo (ZIP-centroid) for weather; Open-Elevation; OpenStreetMap contributors. Public data retrieved Aug 22, 2026; agencies update their layers on their own schedules. Planning data, not a survey or legal advice.