Off-grid site report
Mountrail County, ND
48.3114, -102.3801 · 2,238 ft elevationRead this before you act on anything below. This is my researched starting point for Mountrail County, ND, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.
The local rulesMountrail County, ND
Zoning & raw-land occupancy
Varies locallyMountrail County has a Land Development Code adopted under state authority (NDCC 54-21.3), but some cities and organized townships keep their own separate zoning authority, so you must confirm which jurisdiction covers a given parcel. source
Dwellings, tiny homes & RVs
Varies locallyNo published minimum dwelling size or RV occupancy rule was found; mobile/manufactured homes have required a conditional use permit in at least one documented county case, so check with Planning & Zoning for your district. source
Building permits & codes
Generally allowedThe county requires a building/demolition permit, with setbacks and any conditional use or variance resolved before issuance by the Planning & Zoning Board; permits expire one year from issue. source
Septic & composting toilets
Generally allowedSeptic (ISTS) permits are issued by the Upper Missouri District Health Unit and are valid for twelve months; as of a 2025 state law, installer licensing for septic systems is overseen by the state DEQ, except for owners installing on their own property for personal use. source
Greywater reuse
Unclear - verifyNo county or UMDHU page specifically addresses residential greywater reuse; this is not confirmed, so contact UMDHU before installing a system.
Rainwater harvesting
Generally allowedNo county-specific rainwater ordinance was found; this follows the state baseline of being generally legal, though larger or underground systems may need a building permit, best confirmed with the county building office.
Private wells & water rights
Generally allowedThe county refers well and water-rights questions to the North Dakota State Water Commission and water quality/siting questions to UMDHU rather than running its own program; domestic/stock wells are generally exempt from full state appropriation permitting. source
Living disconnected from utilities
Unclear - verifyNo county ordinance mandating utility hookup was found, but off-grid structures still must go through the building permit, setback, and septic approval process regardless of power source.
Sun30-year normals
- Peak-sun hours, annual average
- 4.6 hrs/day
- Worst month (sizes an off-grid array)
- 2.5 hrs/day
- Yearly output per 1 kW of panels
- 1,361 kWh
JFMAMJJASOND
Weather1991-2020
- Precipitation
- 19 in/yr
- Snowfall
- 46 in/yr
- Heating degree days
- 9,791 (severe)
- Frost-free season
- May 17 to Sep 20
How far help isstraight-line
- Hospital
Mountrail County Medical Center - 0.0 mi
- Fire station
- none within range
- Hardware store
Satermo's - 23.4 mi
- Grocery
- none within range
From OpenStreetMap. Road miles will be longer, often much longer in hill country.
Plan this spot
These open with this location's real numbers already filled in (ZIP 58784).
Size a solar systemHeat loss & insulationFirewood per winterRainwater harvestGarden sizePanel tilt
Share or save this report:New report
Sources: US Census Bureau geocoder; NLR PVWatts v8 (solar); NOAA NCEI 1991-2020 climate normals (nearest station) or Open-Meteo (ZIP-centroid) for weather; Open-Elevation; OpenStreetMap contributors. Public data retrieved Aug 22, 2026; agencies update their layers on their own schedules. Planning data, not a survey or legal advice.