Off-grid site report

Chesterfield County, SC

34.6851, -79.8965 · 171 ft elevation
Read this before you act on anything below. This is my researched starting point for Chesterfield County, SC, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.

The local rulesChesterfield County, SC

Zoning & raw-land occupancy
Unclear - verifyA Joint Planning Commission and zoning boards exist, but no unincorporated-area zoning map or ordinance text was found. Confirm parcel status with the county directly. source
Dwellings, tiny homes & RVs
Unclear - verifyNo county-specific tiny home or RV occupancy ordinance found; manufactured home placement goes through county Building Codes, but towns within the county may add their own approval.
Building permits & codes
Generally allowedChesterfield County's Building Codes department enforces the mandatory South Carolina statewide building code and issues local permits. source
Septic & composting toilets
RestrictedNo county septic ordinance exists; the state's SCDES requires approval and an installation permit under its onsite wastewater regulation before the county issues a building permit. source
Greywater reuse
RestrictedNo Chesterfield County greywater rule was found; the state (SCDES) baseline expects an engineered subsurface system for reuse.
Rainwater harvesting
Unclear - verifyNo county or state-specific rainwater harvesting rule was found for this county; check with Building Codes before connecting a system to potable plumbing.
Private wells & water rights
RestrictedNo county-added well rules were found; wells are governed by state SCDES regulation and processed through SCDES's local office network. source
Living disconnected from utilities
Varies locallyNo ordinance explicitly requires grid, water, or sewer hookup for occupancy, but septic and well permitting attach indirectly to any inhabited structure.

Open the full county page with sources →

Sun30-year normals

Peak-sun hours, annual average
5.2 hrs/day
Worst month (sizes an off-grid array)
4.1 hrs/day
Yearly output per 1 kW of panels
1,445 kWh
JFMAMJJASOND

Weather1991-2020

Precipitation
46 in/yr
Snowfall
1 in/yr
Heating degree days
3,065 (moderate)
Frost-free season
Mar 27 to Nov 9

How far help isstraight-line

Hospital
McLeod Health Cheraw
1.5 mi
Fire station
Patrick Rural Fire Department
11.4 mi
Hardware store
Lowe's
18.2 mi
Grocery
IGA
0.2 mi

From OpenStreetMap. Road miles will be longer, often much longer in hill country.

Plan this spot

These open with this location's real numbers already filled in (ZIP 29520).

Size a solar systemHeat loss & insulationFirewood per winterRainwater harvestGarden sizePanel tilt

Share or save this report:New report

Sources: US Census Bureau geocoder; NLR PVWatts v8 (solar); NOAA NCEI 1991-2020 climate normals (nearest station) or Open-Meteo (ZIP-centroid) for weather; Open-Elevation; OpenStreetMap contributors. Public data retrieved Aug 22, 2026; agencies update their layers on their own schedules. Planning data, not a survey or legal advice.