Off-grid site report
Chouteau County, MT
47.8065, -110.6792 · 2,638 ft elevationRead this before you act on anything below. This is my researched starting point for Chouteau County, MT, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.
The local rulesChouteau County, MT
Zoning & raw-land occupancy
Varies locallyChouteau County has no conventional zoning map but requires Development Permits under countywide Development Regulations for many land use changes; Fort Benton, Big Sandy, and Geraldine administer their own separate rules within town limits. source
Dwellings, tiny homes & RVs
Unclear - verifyThe county has a Summary Permit process for residential dwelling units, but no specific rule for tiny homes on wheels or RVs as permanent dwellings was found; Montana state baseline is inherited. source
Building permits & codes
Unclear - verifyMontana allows counties to opt into enforcing building codes, but it is not confirmed whether Chouteau County has done so for single-family homes; confirm with the Planning Office. source
Septic & composting toilets
Generally allowedSeptic systems are permitted through the Chouteau County Department of Public Health's Environmental Health function, operating under Montana DEQ minimum standards. source
Greywater reuse
Unclear - verifyNo Chouteau County-specific greywater rule was found; the state's baseline greywater allowances apply by default.
Rainwater harvesting
Generally allowedNo county-specific restriction was found on rooftop rainwater collection for personal non-potable use; this follows Montana's permissive state baseline.
Private wells & water rights
Generally allowedPrivate wells generally qualify as DNRC exempt wells (10 acre-feet/year or less, 35 gpm or less) with no separate county well permitting layer, though subdivision review can trigger DEQ/COSA involvement. source
Living disconnected from utilities
Unclear - verifyNo explicit Chouteau County requirement to connect to grid utilities was found; the Development Regulations address service costs indirectly through the permitting process. source
Sun30-year normals
- Peak-sun hours, annual average
- 4.6 hrs/day
- Worst month (sizes an off-grid array)
- 2.4 hrs/day
- Yearly output per 1 kW of panels
- 1,335 kWh
JFMAMJJASOND
Weather1991-2020
- Precipitation
- 12 in/yr
- Snowfall
- 39 in/yr
- Heating degree days
- 7,624 (severe)
- Frost-free season
- May 19 to Sep 19
How far help isstraight-line
- Hospital
Great Falls Clinic Hospital - 34.7 mi
- Fire station
Loma Rural Fire Department - 12.3 mi
- Hardware store
- none within range
- Grocery
Fresh Start Cooperative - 23.8 mi
From OpenStreetMap. Road miles will be longer, often much longer in hill country.
Plan this spot
These open with this location's real numbers already filled in (ZIP 59442).
Size a solar systemHeat loss & insulationFirewood per winterRainwater harvestGarden sizePanel tilt
Share or save this report:New report
Sources: US Census Bureau geocoder; NLR PVWatts v8 (solar); NOAA NCEI 1991-2020 climate normals (nearest station) or Open-Meteo (ZIP-centroid) for weather; Open-Elevation; OpenStreetMap contributors. Public data retrieved Aug 21, 2026; agencies update their layers on their own schedules. Planning data, not a survey or legal advice.
