Start here:System PlannerOne plan for power, heat and waterLand CheckAssess a parcel before you buy itFree CourseOff-grid from zero, in 12 lessons
Off-grid site report

Stanislaus County, CA

37.6538, -121.0178 · 92 ft elevation
Read this before you act on anything below. This is my researched starting point for Stanislaus County, CA, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.

The local rulesStanislaus County, CA

Zoning & raw-land occupancy
RestrictedStanislaus County Planning Department administers its own countywide Zoning Ordinance (Title 21); minimum lot sizes depend on sewer/water access, and occupying raw land without an approved dwelling isn't a recognized use. source
Dwellings, tiny homes & RVs
RestrictedStanislaus County Code Enforcement explicitly prohibits living in an RV or travel trailer outside designated campgrounds; temporary mobile homes are allowed only in narrow cases like elder care or ag employee housing on qualifying zoned parcels.
Building permits & codes
RestrictedThe county requires permits reviewed through a centralized 'One Stop Shop' involving Planning, DER, Public Works, and the Fire Warden's Office; owner-builders need Assessor records and often septic documentation. source
Septic & composting toilets
RestrictedDER regulates septic/OWTS under its own Local Agency Management Program with specific setback and floodplain siting rules that go beyond generic state minimums. source
Greywater reuse
Generally allowedNo Stanislaus-specific greywater ordinance was found beyond the state Plumbing Code; treated as following the state baseline, but not confirmed as the full picture, so check with DER.
Rainwater harvesting
Generally allowedNo county-specific rainwater ordinance was found; appears to defer to the state Water Code/Rainwater Capture Act, but this isn't fully confirmed with the county.
Private wells & water rights
RestrictedDER is the Local Enforcement Agency for wells and has adopted its own Groundwater Well Siting and Construction Guidelines, including drawdown thresholds and registration/metering rules for larger or newer wells.
Living disconnected from utilities
Unclear - verifyNo standalone ordinance mandates utility hookups, but RV occupancy bans and septic/well permitting requirements make fully off-grid dwelling without approved water and wastewater systems difficult in practice; not confirmed as an explicit standalone rule.

Open the full county page with sources →

Sun30-year normals

Peak-sun hours, annual average
5.9 hrs/day
Worst month (sizes an off-grid array)
3.6 hrs/day
Yearly output per 1 kW of panels
1,649 kWh
JFMAMJJASOND

Weather1991-2020

Precipitation
13 in/yr
Snowfall
0 in/yr
Heating degree days
2,172 (mild)
Frost-free season
Jan 25 to Dec 12

How far help isstraight-line

Hospital
Doctors Medical Center
1.4 mi
Fire station
Fire Station Number 4
0.8 mi
Hardware store
Orchard Supply Hardware
2.5 mi
Grocery
O'Brien's Market
0.9 mi

From OpenStreetMap. Road miles will be longer, often much longer in hill country.

Plan this spot

These open with this location's real numbers already filled in (ZIP 95352).

Size a solar systemHeat loss & insulationFirewood per winterRainwater harvestGarden sizePanel tilt

Looking at a specific parcel in Stanislaus County, CA?The rules above are the jurisdiction. The land check runs the parcel itself: flood zone, soils and septic suitability, wetlands, slope, access, climate, and these verdicts, from a parcel number or coordinates.
Check a parcel →
Share or save this report:New report

Sources: US Census Bureau geocoder; NLR PVWatts v8 (solar); NOAA NCEI 1991-2020 climate normals (nearest station) or Open-Meteo (ZIP-centroid) for weather; Open-Elevation; OpenStreetMap contributors. Public data retrieved Aug 22, 2026; agencies update their layers on their own schedules. Planning data, not a survey or legal advice.

New here, or not sure where this fits? Start here walks through the whole thing in order.