Start here:System PlannerOne plan for power, heat and waterLand CheckAssess a parcel before you buy itFree CourseOff-grid from zero, in 12 lessons
Off-grid site report

Greene County, IN

39.0487, -87.1381
Read this before you act on anything below. This is my researched starting point for Greene County, IN, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.

The local rulesGreene County, IN

Zoning & raw-land occupancy
Generally allowedGreene County's own FAQ states the county is not subject to planning or zoning ordinances countywide; incorporated towns like Bloomfield, Linton, and Worthington may have their own separate zoning not covered by this. source
Dwellings, tiny homes & RVs
Unclear - verifyNo county zoning or building code addresses tiny homes, RV occupancy, or minimum dwelling size; not confirmed whether any town within the county regulates this differently. Ask the county or the relevant town hall. source
Building permits & codes
Generally allowedThe county has no general building permit or code for typical residential construction; the septic permit is the only county-required permit. Commercial Class 1 structures may need state-level review through Indiana Homeland Security. source
Septic & composting toilets
Generally allowedA permit from the Greene County Health Department is required before installing, altering, or repairing any private sewage system or privy, per county ordinance, and systems must meet the state's onsite sewage rule. source
Greywater reuse
Unclear - verifyNo Greene County ordinance or state health department page specifically addressing greywater reuse separate from full septic treatment was found; ask the county Health Department directly.
Rainwater harvesting
Unclear - verifyNo Greene County ordinance addressing rainwater catchment was found; the state baseline appears permissive but this wasn't separately confirmed for the county.
Private wells & water rights
Generally allowedPrivate wells are governed by the statewide Indiana DNR licensing and construction permit framework; no additional Greene County restriction was found. source
Living disconnected from utilities
Generally allowedNo countywide mandate to connect to electric or water utilities was found; the county's sewage ordinance does require connecting to public sewer if it comes within a set distance of an occupied structure and the private system fails. source

Open the full county page with sources →

Sun30-year normals

Peak-sun hours, annual average
4.8 hrs/day
Worst month (sizes an off-grid array)
2.7 hrs/day
Yearly output per 1 kW of panels
1,360 kWh
JFMAMJJASOND

Weather1991-2020

Precipitation
46 in/yr
Heating degree days
5,336 (moderate)
Frost-free season
Apr 18 to Oct 21

How far help isstraight-line

Hospital
Greene County General Hospital
0.7 mi
Fire station
Linton Fire Department
1.9 mi
Hardware store
Riles Home Hardware Supply
0.6 mi
Grocery
Walmart Supercenter
1.0 mi

From OpenStreetMap. Road miles will be longer, often much longer in hill country.

Plan this spot

These open with this location's real numbers already filled in (ZIP 47441).

Size a solar systemHeat loss & insulationFirewood per winterRainwater harvestGarden sizePanel tilt

Looking at a specific parcel in Greene County, IN?The rules above are the jurisdiction. The land check runs the parcel itself: flood zone, soils and septic suitability, wetlands, slope, access, climate, and these verdicts, from a parcel number or coordinates.
Check a parcel →
Share or save this report:New report

Sources: US Census Bureau geocoder; NLR PVWatts v8 (solar); NOAA NCEI 1991-2020 climate normals (nearest station) or Open-Meteo (ZIP-centroid) for weather; Open-Elevation; OpenStreetMap contributors. Public data retrieved Aug 22, 2026; agencies update their layers on their own schedules. Planning data, not a survey or legal advice.

New here, or not sure where this fits? Start here walks through the whole thing in order.