Off-Grid Laws › Texas

Off-Grid Living in Real County, Texas

Real County has no general zoning and no confirmed countywide building code, giving off-gridders real flexibility, but septic systems and well drilling are both regulated, the latter unusually so because the county sits inside the Real-Edwards Conservation and Reclamation District. Several dimensions (dwelling rules, greywater, utility mandates) are simply not addressed in available county sources, so calling the county directly is the honest next step.

Is it legal to live off-grid in Real County, Texas?

There is no outright ban on living off-grid in Real County, Texas - it is generally possible. Zoning and land use are generally allowed, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are not clearly documented online, so confirm it locally. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Real County before you buy land or build.

Read this before you act on anything below. This is my researched starting point for Real County, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.
Primary-source verified · reviewed Aug 202613 government, statute, or municipal sources are linked below; the verdict card cites them where a match exists.

The verdict for Real County

  • Zoning: Generally allowed
  • Dwellings, tiny homes: Unclear - verify
  • Building permits: Unclear - verify
  • Septic: Generally allowed
  • Greywater reuse: Unclear - verify
  • Rainwater harvesting: Generally allowed
  • Private wells: Restricted
  • Living disconnected from utilities: Unclear - verify

Real County at a glance

Zoning & raw-land occupancy
Generally allowedReal County has no general countywide zoning authority, this is a Texas state-law baseline for unincorporated counties. The county does regulate land division through its own subdivision rules adopted by the Commissioners' Court. source
Dwellings, tiny homes & RVs
Unclear - verifyNo Real County ordinance specifically addressing tiny homes, minimum dwelling size, or RV occupancy was found. State law only gives counties narrow, permissive authority over residential construction standards since 2009, and there's no statewide minimum size. Confirm current status with the county.
Building permits & codes
Unclear - verifyNot confirmed whether Real County has adopted a general residential building code; Texas counties typically have limited authority focused on floodplain and platting rather than full building codes. Check with the County Judge's office. source
Septic & composting toilets
Generally allowedSeptic systems are regulated statewide by Texas Health and Safety Code Chapter 366 and TCEQ rules (30 TAC 285); a permit is required unless your property is 10+ acres with no effluent crossing the property line. The exact Real County administering office is not confirmed, so call the County Judge's office to verify. source
Greywater reuse
Unclear - verifyNo standalone Real County or TCEQ greywater program was found; greywater appears to be handled under the general OSSF/septic rules rather than as its own permit category.
Rainwater harvesting
Generally allowedNo Real County ordinance restricts rainwater harvesting, and Texas state policy is generally encouraging of it, subject to plumbing backflow rules for connected systems.
Private wells & water rights
RestrictedReal County sits inside the Real-Edwards Conservation and Reclamation District, which regulates groundwater wells in Real and Edwards counties; an application must be filed with the District before drilling, unlike counties with no groundwater district. source
Living disconnected from utilities
Unclear - verifyNo state or Real County rule was found requiring connection to grid electric, water, or sewer for rural unincorporated property, and the county has no incorporated cities imposing such mandates in available sources.

Who to call in Real County

Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.

I've been digging into Real County, Texas for anyone thinking about going off-grid out in the Hill Country, and here's the honest picture based on what I could confirm.

Zoning: Real County, like all Texas counties, has no general zoning authority over unincorporated land, that's a state-level limitation baked into Texas law. So you won't run into a zoning board telling you what you can build where. That said, the Real County Commissioners' Court has adopted its own subdivision rules (most recently updated December 2024) that govern how land gets divided and set some development standards, especially around water and infrastructure. If you're subdividing or platting, that's the document to read.

Dwellings, tiny homes, RVs: I couldn't find a Real County ordinance specifically addressing tiny homes, minimum house sizes, or RV occupancy. Texas counties only got narrow, permissive authority to regulate residential construction standards in unincorporated areas starting in 2009, and there's no statewide minimum size requirement. Practically, this suggests more flexibility than a city would allow, but I'd still call the county to confirm nothing has changed.

Building permits: This one's genuinely unclear. Texas counties generally have less regulatory reach than cities, often focusing on floodplain, platting, and fire code rather than a full residential building code. I found no evidence Real County has adopted a countywide building permit system outside its subdivision rules. Confirm with the County Judge's office before assuming you're in the clear.

Septic: This is state-regulated no matter where you are in Texas. Under Texas Health and Safety Code Chapter 366 and TCEQ rules (30 TAC 285), you need a permit for an on-site sewage facility. Real County likely administers this locally as TCEQ's authorized agent, but I couldn't confirm exactly which office handles it, so call the County Judge's office to verify. One relevant exemption: if your property is 10 acres or more and effluent won't cross the property line, the permit requirement itself is waived (though design standards still apply).

Greywater: No dedicated Real County or TCEQ greywater program page turned up. It appears to fall under the general OSSF septic rules rather than a separate category.

Rainwater harvesting: No restrictions found at the county or state level. Texas policy generally encourages it, though any system tied into household plumbing should respect backflow/cross-connection rules.

Wells: Here's a meaningful local wrinkle: Real County actually sits inside the Real-Edwards Conservation and Reclamation District, a groundwater district covering Real and Edwards counties. That means the usual Texas "rule of capture" free-for-all doesn't fully apply here. You need to file an application with the District before drilling.

Utilities: No state or county rule requiring hookup to grid power, water, or sewer was found. Real County has no incorporated cities that would impose such mandates, based on available sources.

Bottom line: Real County is genuinely permissive on zoning and building, but don't skip the septic permit or the groundwater district paperwork, those are real, state-backed requirements with local teeth.

Real County in numbers

Worst-month sun
4.2 peak hours/day (5.4 annual average)
Heating degree days
2,402
Precipitation / snow
30.25 in / 0.2 in a year
Frost-free season
04-01 to 11-03
Elevation
1,608 ft
Fire station
Leakey Volunteer Fire Department · 0.5 mi
Hardware
Hevenor Lumber & Hardware · 15.5 mi
Hospital
Uvalde Memorial Hospital · 35.4 mi
Supermarket
Leakey Mercantile · 0.2 mi

Open the full site report for this spot →

30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.

Planning a build in Real County

The rules above decide what you may build. The numbers below decide what you will have to build, and they come from this place rather than from a national average.

Solar: size for the worst month, not the average

Real County averages 5.4 peak sun hours a day across the year, but its worst month averages 4.2. That is a drop of about 23 percent. An array sized on the annual figure will therefore come up short in the worst month by roughly that much, in the season when lights, pumps, and heating fans all run hardest.

Put another way, meeting the same daily load in the worst month here takes about 1.3 times the array that the annual average implies, or a generator and the fuel budget to run it. Neither is wrong; what is wrong is discovering the gap in the first winter. The solar calculator runs this arithmetic against your own load list, and lesson four covers building that list before buying panels.

Heat: 2,402 heating degree days

That is a moderate heating season, where a single well-chosen appliance usually carries the house. Heating demand at this level dwarfs everything electrical in the house, which is why almost nobody here heats with electricity from a battery bank.

As a rough order of magnitude, a small, reasonably insulated cabin heated mainly with wood in a climate like this tends to burn in the region of 2.0 cords a season, with the real figure swinging widely on insulation, house size, and how you burn. Treat that as a bracket for planning your woodshed rather than a promise, split and stack a season ahead, and check with a moisture meter before burning. The firewood calculator and heat-loss calculator narrow it down from your own building.

Growing season: about 216 frost-free days

Average last frost falls around 04-01 and average first frost around 11-03, which leaves roughly 216 days between them. That figure decides what can be grown outdoors without protection, whether a season extension structure is worth building, and how much of the year food storage has to cover. Averages also hide the frost that arrives two weeks early, so plan the garden on the short end. The garden calculator and food storage calculator work from this number.

Water: what the roof would actually catch

Real County receives about 30.3 inches of precipitation a year. A 1,000 square foot roof here would shed on the order of 16,019 gallons a year at a realistic 85 percent collection efficiency, before any losses to first-flush diversion, evaporation, or overflow in a heavy storm.

The annual total is the easy part. What sizes a cistern is the longest dry stretch, because catchment is seasonal almost everywhere and a tank that covers the average year can still run empty in August. Check the local rules too: rainwater harvesting is regulated in some states even where it is broadly allowed. The rainwater calculator works from your own roof and rainfall pattern, and lesson three covers why water is chosen before power.

Distance is part of the plan

Measured straight line from the center of Real County: the nearest fire station is about 0.5 miles away (Leakey Volunteer Fire Department), the nearest hospital is about 35.4 miles away (Uvalde Memorial Hospital), the nearest supermarket is about 0.2 miles away (Leakey Mercantile). Road miles will be longer, and in winter longer again.

The fire distance is worth noting before you buy rather than at renewal: insurers commonly rate rural property partly on how far it is from a responding station and from a water source, and some decline off-grid or owner-built structures outright. Ask an agent who writes rural policies what they would need to see, while the answer can still change what you build. Lesson eleven covers the insurance and financing side.

The hospital distance sets what your first aid kit and your medical plan have to cover in the gap, and it is the number to think about before anyone in the household depends on refrigerated medication or mains-powered equipment.

Confirming this for your own parcel

On this page 4 of the eight topics are recorded as unclear or as varying within Real County: what counts as a dwelling, building permits and codes, greywater, mandatory utility connection. Those are the calls to make first, because they are the ones where a general answer cannot be trusted for a specific parcel. Ask for the answer in writing where the office will give it, and note the name and the date where it will not.

Where a topic is recorded as settled here (zoning, septic and sewage, rainwater harvesting, wells and water rights), the source is cited further down this page. Sources go stale, ordinances get amended, and this site logs corrections publicly rather than editing them away, so if you find something here that no longer matches the county, the corrections page is how to say so.

Before any of those calls, walk the parcel with the land walk checklist and take the questions for the county with you. The parcel check pulls flood, wetland, slope, and access data for a specific parcel and shows its sources, which is a good way to arrive at the office with the questions already framed. Lesson two is the wider version of this list.

Looking at a specific parcel in Real County, TX?The rules above are the jurisdiction. The land check runs the parcel itself: flood zone, soils and septic suitability, wetlands, slope, access, climate, and these verdicts, from a parcel number or coordinates.
Check a parcel →

Live here? Help keep Real County accurate.

Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.

This page is

FAQ

Common questions about off-grid living in Real County

Is it legal to live off-grid in Real County, Texas?

There is no outright ban on living off-grid in Real County, Texas - it is generally possible. Zoning and land use are generally allowed, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are not clearly documented online, so confirm it locally. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Real County before you buy land or build.

Does Real County require a building permit to build my off-grid home?

I couldn't confirm a countywide residential building permit ordinance in Real County. Texas counties have limited building code authority compared to cities, so call the County Judge's office to check current requirements before you build.

Can I drill my own well in Real County without a permit?

No, not freely. Real County is inside the Real-Edwards Conservation and Reclamation District, and you need to file an application with that District before drilling, which is different from counties that have no groundwater district oversight.

Do I need a septic permit if my property is small?

Generally yes, Texas Health and Safety Code Chapter 366 and TCEQ rules require an OSSF permit. There's a state exemption if your property is 10 acres or more and no effluent crosses the property line, but the design still must meet standards.

Is there a minimum house size or rule against tiny homes in Real County?

Not that I could confirm. No county-specific ordinance on dwelling size or tiny homes was found, and Texas law gives counties only limited authority here, but confirm with the county directly since this wasn't fully settled in available sources.

New here, or not sure where this fits? Start here walks through the whole thing in order.