Off-Grid Living in Kendall County, Texas
Kendall County has no zoning in unincorporated areas and no general building code, but nearly everything (septic, wells, access) runs through its Development Permit process, and groundwater wells are regulated by the Cow Creek Groundwater Conservation District. Confirm specifics with the county Engineer's Office, the county Health Department, and Cow Creek GCD before you build.
Is it legal to live off-grid in Kendall County, Texas?
There is no outright ban on living off-grid in Kendall County, Texas - it is legal but regulated. Zoning and land use are generally allowed, putting a cabin, tiny home, or RV on raw land is set locally and vary by area, and building permits are restricted. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (generally allowed). Because these rules are set locally, confirm the specifics with Kendall County before you buy land or build.
The verdict for Kendall County
- Zoning: Generally allowed
- Dwellings, tiny homes: Varies locally
- Building permits: Restricted
- Septic: Generally allowed
- Greywater reuse: Unclear - verify
- Rainwater harvesting: Generally allowed
- Private wells: Restricted
- Living disconnected from utilities: Generally allowed
Kendall County at a glance
Who to call in Kendall County
- Planning Kendall County Engineer's Office (Development)
- Septic and health Kendall County Environmental Health / Kendall County Health Department
- Other Kendall County Clerk's Office 830-331-8233
- Wells and water Cow Creek Groundwater Conservation District
- Building permits City of Boerne Building/Planning Department
- Environmental TCEQ OSSF Program
Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.
I've been digging into what off-grid living actually looks like in Kendall County, Texas, and the short version is: the county gives you real freedom on land use, but it channels almost everything through a "Development Permit" process, and groundwater is more tightly managed than in most Texas counties. Here's what I found, broken down by topic, with the caveat that I'm researching this from official documents, not living it myself.
Zoning and raw land. Kendall County has no countywide zoning in unincorporated areas, confirmed on the county's own site. You can generally sit on raw land without a zoning permit, but you still have to respect any deed restrictions, subdivision covenants, or HOA rules tied to your specific parcel, and towns like Boerne run their own rules inside city limits and their extraterritorial jurisdiction (ETJ).
Dwellings, tiny homes, RVs. There's no county-enforced residential building code dictating structure type, minimum square footage, or how long an RV can serve as a dwelling, and I couldn't confirm any of the "400 sq ft" or IRC-based claims floating around commercial sites against an official county page. What the county does control is the development-permit path: address assignment, dark-sky lighting, driveway/access, septic (OSSF), and platting. Practically, that means your dwelling type isn't reviewed directly, but you can't build without going through that permit chain first.
Building permits. Kendall County doesn't run a general building code in the unincorporated county. Instead, you need a Development Permit before any property development, and specifically before septic or well permits are issued. A 911 Rural Address and Access Permit has to come first, and a lighting permit gets bundled in. Boerne, inside its own limits and ETJ, runs a separate building code the county doesn't touch.
Septic and composting toilets. Septic (OSSF) is permitted and administered by the Kendall County Health Department's Environmental Health Services, working under the Texas Commission on Environmental Quality's statewide OSSF rules (30 TAC 285). The state sets a one-acre minimum lot size for OSSF-served homes not on public water, and there's a referenced 10-acre exemption in state rule, but whether it applies to your parcel needs sign-off from a licensed evaluator and the county, not a blanket assumption.
Greywater. I couldn't find a standalone Kendall County or TCEQ greywater program page. It appears greywater falls under the general statewide OSSF framework rather than its own separate track, so I'd confirm directly with the county health department.
Rainwater harvesting. Nothing suggests Kendall County restricts rainwater collection, and Texas's state baseline is permissive. Whether the county's development permit imposes specific system standards isn't confirmed.
Wells and water rights. This is where Kendall County differs from a lot of Texas: it's fully covered by the Cow Creek Groundwater Conservation District, created to conserve and regulate groundwater in a designated Priority Groundwater Management Area. Even exempt domestic wells typically need registration with Cow Creek GCD, and you need a county Development Permit before a well permit is issued. Don't skip calling them.
Utilities. No county rule found requiring hookup to electric, water, or sewer in unincorporated Kendall County. Any mandatory-connection rule would come from a municipality, not the county.
Kendall County in numbers
- Worst-month sun
- 4.3 peak hours/day (5.4 annual average)
- Heating degree days
- 2,049
- Precipitation / snow
- 38.1 in / ? in a year
- Frost-free season
- 03-20 to 11-14
- Elevation
- 1,421 ft
- Hospital
- Methodist Boerne Emergency Center · 0.5 mi
- Supermarket
- Walmart Supercenter · 0.1 mi
- Fire station
- District 4 Fire and Rescue Station 1 · 4.8 mi
- Hardware
- The Home Depot · 0.9 mi
Open the full site report for this spot →
30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.
Planning a build in Kendall County
The rules above decide what you may build. The numbers below decide what you will have to build, and they come from this place rather than from a national average.
Solar: size for the worst month, not the average
Kendall County averages 5.4 peak sun hours a day across the year, but its worst month averages 4.3. That is a drop of about 21 percent. An array sized on the annual figure will therefore come up short in the worst month by roughly that much, in the season when lights, pumps, and heating fans all run hardest.
Put another way, meeting the same daily load in the worst month here takes about 1.3 times the array that the annual average implies, or a generator and the fuel budget to run it. Neither is wrong; what is wrong is discovering the gap in the first winter. The solar calculator runs this arithmetic against your own load list, and lesson four covers building that list before buying panels.
Heat: 2,049 heating degree days
That is a moderate heating season, where a single well-chosen appliance usually carries the house. Heating demand at this level dwarfs everything electrical in the house, which is why almost nobody here heats with electricity from a battery bank.
As a rough order of magnitude, a small, reasonably insulated cabin heated mainly with wood in a climate like this tends to burn in the region of 1.7 cords a season, with the real figure swinging widely on insulation, house size, and how you burn. Treat that as a bracket for planning your woodshed rather than a promise, split and stack a season ahead, and check with a moisture meter before burning. The firewood calculator and heat-loss calculator narrow it down from your own building.
Growing season: about 239 frost-free days
Average last frost falls around 03-20 and average first frost around 11-14, which leaves roughly 239 days between them. That figure decides what can be grown outdoors without protection, whether a season extension structure is worth building, and how much of the year food storage has to cover. Averages also hide the frost that arrives two weeks early, so plan the garden on the short end. The garden calculator and food storage calculator work from this number.
Water: what the roof would actually catch
Kendall County receives about 38.1 inches of precipitation a year. A 1,000 square foot roof here would shed on the order of 20,176 gallons a year at a realistic 85 percent collection efficiency, before any losses to first-flush diversion, evaporation, or overflow in a heavy storm.
The annual total is the easy part. What sizes a cistern is the longest dry stretch, because catchment is seasonal almost everywhere and a tank that covers the average year can still run empty in August. Check the local rules too: rainwater harvesting is regulated in some states even where it is broadly allowed. The rainwater calculator works from your own roof and rainfall pattern, and lesson three covers why water is chosen before power.
Distance is part of the plan
Measured straight line from the center of Kendall County: the nearest fire station is about 4.8 miles away (District 4 Fire and Rescue Station 1), the nearest hospital is about 0.5 miles away (Methodist Boerne Emergency Center), the nearest supermarket is about 0.1 miles away (Walmart Supercenter). Road miles will be longer, and in winter longer again.
The fire distance is worth noting before you buy rather than at renewal: insurers commonly rate rural property partly on how far it is from a responding station and from a water source, and some decline off-grid or owner-built structures outright. Ask an agent who writes rural policies what they would need to see, while the answer can still change what you build. Lesson eleven covers the insurance and financing side.
The hospital distance sets what your first aid kit and your medical plan have to cover in the gap, and it is the number to think about before anyone in the household depends on refrigerated medication or mains-powered equipment.
Confirming this for your own parcel
On this page 2 of the eight topics are recorded as unclear or as varying within Kendall County: what counts as a dwelling, greywater. Those are the calls to make first, because they are the ones where a general answer cannot be trusted for a specific parcel. Ask for the answer in writing where the office will give it, and note the name and the date where it will not.
Where a topic is recorded as settled here (zoning, building permits and codes, septic and sewage, rainwater harvesting, wells and water rights, mandatory utility connection), the source is cited further down this page. Sources go stale, ordinances get amended, and this site logs corrections publicly rather than editing them away, so if you find something here that no longer matches the county, the corrections page is how to say so.
Before any of those calls, walk the parcel with the land walk checklist and take the questions for the county with you. The parcel check pulls flood, wetland, slope, and access data for a specific parcel and shows its sources, which is a good way to arrive at the office with the questions already framed. Lesson two is the wider version of this list.
Sources
Primary sources (statutes, agencies, municipal documents)
- By Walker H.B. No. 3127 capitol.texas.gov
- Onsite Wastewater Treatment Systems - Homeowner | Kendall County Health Department www.kendallhealth.org
- On-Site Sewage Facilities (Septic Systems): General Information - Texas Commission on Environmental Quality - www.tceq.texas.gov www.tceq.texas.gov
- Texas Administrative Code TITLE 30 ENVIRONMENTAL QUALITY PART 1 newtools.cira.state.tx.us
- 2021 0755 mwd set www.tceq.texas.gov
- LEGISLATIVE BUDGET BOARD capitol.texas.gov
Secondary sources (universities, regional bodies)
- lighting classification idadb.cals.arizona.edu
Only government, statute, municipal, university, and regional-planning sources are listed. Pages used to find an issue but not to substantiate it are not cited. See how this database is researched.
Live here? Help keep Kendall County accurate.
Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.
FAQ
Common questions about off-grid living in Kendall County
Can I legally live off-grid on raw land in Kendall County?
Yes, unincorporated Kendall County has no zoning ordinance, so raw land occupancy is generally allowed, but you still need to check deed restrictions or HOA rules and go through the county's Development Permit process before building or installing septic and wells.
Do I need a permit for a well in Kendall County?
Yes. The Cow Creek Groundwater Conservation District regulates wells across all of Kendall County, and even exempt domestic wells typically need registration. You also need a county Development Permit before a well permit is issued.
Is greywater reuse allowed?
There's no standalone Kendall County or TCEQ greywater program that I could confirm; it likely falls under the general OSSF rules. Best to call the Kendall County Health Department directly.
What about living in an RV or tiny home full time?
The county doesn't appear to have a specific structure-type or size code, but any claims about exact square footage minimums aren't confirmed officially. The permitting path runs through address, access, lighting, and septic approvals rather than a residential building code review.
New here, or not sure where this fits? Start here walks through the whole thing in order.
