Off-Grid Living in Hood County, Texas
Hood County has unusual state-granted development authority but does not require a general building permit for houses in unincorporated areas; septic and well rules are strict and county/district-administered, while greywater and utility-disconnection rules are largely unconfirmed at the county level.
Is it legal to live off-grid in Hood County, Texas?
There is no outright ban on living off-grid in Hood County, Texas - it is generally possible. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are generally allowed. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Hood County before you buy land or build.
The verdict for Hood County
- Zoning: Varies locally
- Dwellings, tiny homes: Unclear - verify
- Building permits: Generally allowed
- Septic: Generally allowed
- Greywater reuse: Unclear - verify
- Rainwater harvesting: Generally allowed
- Private wells: Restricted
- Living disconnected from utilities: Unclear - verify
Hood County at a glance
Who to call in Hood County
- Zoning Hood County Development Department (817) 408-2515
- Septic and health Hood County Environmental Health Department 817-579-3288
- Wells and water Upper Trinity Groundwater Conservation District
- Environmental Texas Commission on Environmental Quality (TCEQ) OSSF Program (512) 239-3799
Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.
Hood County, Texas is an interesting case because it's not a typical "counties can't zone" Texas county. The Texas Legislature gave Hood County special development-regulation authority under Local Government Code Chapter 231, Subchapter K, which is the legal basis for the county's Development Permit Regulations, Subdivision Regulations, and Manufactured Home Rental Community Regulations. So while it's not zoning in the traditional city sense, the county does have real say over new development countywide, including land inside a city's extraterritorial jurisdiction (ETJ). If your land sits in a city's ETJ, that city may layer on its own rules too, so I'd check with both the county and the relevant town.
Here's the part that surprised me doing this research: Hood County says outright it will not issue you a general building permit to build a house in the unincorporated county. The Development Department told residents plainly that no Hood County Building Permit is needed for home construction, and the county doesn't inspect residential construction. The exception is in-ground pools, which do need a permit. But that doesn't mean anything goes. Before a new development can proceed, the Commissioners' Court has to sign off on a concept or site development plan, so the "development permit" gate is separate from a "building code" gate.
Where the county is very hands-on is septic. Hood County's Environmental Health Department is TCEQ's authorized local agent for On-Site Sewage Facilities (septic systems), and a permit is mandatory for installing, modifying, or replacing one. If you go with an aerobic system and want to maintain it yourself, the county requires you to live there, complete state or county-approved training, and report test results periodically (three times a year). Greywater has no standalone county rule I could find, it's presumably folded into that same OSSF framework, so ask Environmental Health directly.
Wells are meaningfully regulated here. The Upper Trinity Groundwater Conservation District, covering Hood, Montague, Parker, and Wise counties, requires new wells to be registered before drilling and follow spacing rules, roughly a minimum 2-acre property, 50 feet from property lines, and 150 feet from other registered wells. Older wells (pre-2009) can be registered without a fee. Rainwater harvesting, by contrast, is actively encouraged, the District has run a rainwater harvesting grant program.
On living disconnected from utilities entirely, I found no county ordinance mandating hookup to electric, water, or sewer for unincorporated land, and since there's no general building permit gate, there's no obvious enforcement mechanism either. That's not a guarantee, just an absence of evidence, so don't treat it as settled.
Bottom line: Hood County gives you more room than most people expect on construction and utilities, but is strict and specific about septic and wells, and the county itself will not tell you if a given parcel can legally host a mobile home, you're pointed toward deed covenants or a private site evaluator for that.
Hood County in numbers
- Worst-month sun
- 4.5 peak hours/day (5.6 annual average)
- Heating degree days
- 2,599
- Precipitation / snow
- 32.18 in / 0.1 in a year
- Elevation
- 712 ft
- Supermarket
- Walmart Supercenter · 0.1 mi
- Hospital
- Lake Granbury Medical Center · 1.4 mi
- Hardware
- The Home Depot · 0.2 mi
- Fire station
- Granbury Fire Department · 1.6 mi
Open the full site report for this spot →
30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.
Planning a build in Hood County
The rules above decide what you may build. The numbers below decide what you will have to build, and they come from this place rather than from a national average.
Solar: size for the worst month, not the average
Hood County averages 5.6 peak sun hours a day across the year, but its worst month averages 4.5. That is a drop of about 19 percent. An array sized on the annual figure will therefore come up short in the worst month by roughly that much, in the season when lights, pumps, and heating fans all run hardest.
Put another way, meeting the same daily load in the worst month here takes about 1.2 times the array that the annual average implies, or a generator and the fuel budget to run it. Neither is wrong; what is wrong is discovering the gap in the first winter. The solar calculator runs this arithmetic against your own load list, and lesson four covers building that list before buying panels.
Heat: 2,599 heating degree days
That is a moderate heating season, where a single well-chosen appliance usually carries the house. Heating demand at this level dwarfs everything electrical in the house, which is why almost nobody here heats with electricity from a battery bank.
As a rough order of magnitude, a small, reasonably insulated cabin heated mainly with wood in a climate like this tends to burn in the region of 2.2 cords a season, with the real figure swinging widely on insulation, house size, and how you burn. Treat that as a bracket for planning your woodshed rather than a promise, split and stack a season ahead, and check with a moisture meter before burning. The firewood calculator and heat-loss calculator narrow it down from your own building.
Water: what the roof would actually catch
Hood County receives about 32.2 inches of precipitation a year. A 1,000 square foot roof here would shed on the order of 17,041 gallons a year at a realistic 85 percent collection efficiency, before any losses to first-flush diversion, evaporation, or overflow in a heavy storm.
The annual total is the easy part. What sizes a cistern is the longest dry stretch, because catchment is seasonal almost everywhere and a tank that covers the average year can still run empty in August. Check the local rules too: rainwater harvesting is regulated in some states even where it is broadly allowed. The rainwater calculator works from your own roof and rainfall pattern, and lesson three covers why water is chosen before power.
Distance is part of the plan
Measured straight line from the center of Hood County: the nearest fire station is about 1.6 miles away (Granbury Fire Department), the nearest hospital is about 1.4 miles away (Lake Granbury Medical Center), the nearest supermarket is about 0.1 miles away (Walmart Supercenter). Road miles will be longer, and in winter longer again.
The fire distance is worth noting before you buy rather than at renewal: insurers commonly rate rural property partly on how far it is from a responding station and from a water source, and some decline off-grid or owner-built structures outright. Ask an agent who writes rural policies what they would need to see, while the answer can still change what you build. Lesson eleven covers the insurance and financing side.
The hospital distance sets what your first aid kit and your medical plan have to cover in the gap, and it is the number to think about before anyone in the household depends on refrigerated medication or mains-powered equipment.
Confirming this for your own parcel
On this page 4 of the eight topics are recorded as unclear or as varying within Hood County: zoning, what counts as a dwelling, greywater, mandatory utility connection. Those are the calls to make first, because they are the ones where a general answer cannot be trusted for a specific parcel. Ask for the answer in writing where the office will give it, and note the name and the date where it will not.
Where a topic is recorded as settled here (building permits and codes, septic and sewage, rainwater harvesting, wells and water rights), the source is cited further down this page. Sources go stale, ordinances get amended, and this site logs corrections publicly rather than editing them away, so if you find something here that no longer matches the county, the corrections page is how to say so.
Before any of those calls, walk the parcel with the land walk checklist and take the questions for the county with you. The parcel check pulls flood, wetland, slope, and access data for a specific parcel and shows its sources, which is a good way to arrive at the office with the questions already framed. Lesson two is the wider version of this list.
Sources
Primary sources (statutes, agencies, municipal documents)
- HOOD COUNTY DEVELOPMENT RULES AND REGULATIONS SECTION I hoodcounty.texas.gov
- FAQs - Hood County, TX hoodcounty.texas.gov
- Development - Hood County, TX - Texas.gov hoodcounty.texas.gov
- Hood County Development Regulations - Texas.gov hoodcounty.texas.gov
- Forms - Hood County, TX hoodcounty.texas.gov
- 2024 Texas Statutes :: Local Government Code :: Title 7 - Regulation of Land Use, Structures, Businesses, and Related Activities :: Subtitle B - County Regulatory Authority :: Chapter 231 - County Zoning Authority :: Subchapter K. Development Regulations in Hood County law.justia.com
- Environmental Health Department - Hood County, TX hoodcounty.texas.gov
- On-Site Sewage Facilities (OSSF) - Hood County, TX hoodcounty.texas.gov
- LEGISLATIVE BUDGET BOARD capitol.texas.gov
- Upper Trinity Groundwater Conservation District - Hood County hoodcounty.texas.gov
- Upper Trinity Groundwater Conservation District 2020 ... www.twdb.texas.gov
- § 153.34 MANUFACTURED HOME PARK REGULATIONS. codelibrary.amlegal.com
Only government, statute, municipal, university, and regional-planning sources are listed. Pages used to find an issue but not to substantiate it are not cited. See how this database is researched.
Live here? Help keep Hood County accurate.
Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.
FAQ
Common questions about off-grid living in Hood County
Is it legal to live off-grid in Hood County, Texas?
There is no outright ban on living off-grid in Hood County, Texas - it is generally possible. Zoning and land use are set locally and vary by area, putting a cabin, tiny home, or RV on raw land is not clearly documented online, so confirm it locally, and building permits are generally allowed. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Hood County before you buy land or build.
Do I need a building permit to build a house in unincorporated Hood County?
No. The county explicitly says you will not need a Hood County Building Permit to build a house in the unincorporated area, though in-ground pools are an exception. That said, you'll still need to satisfy the county's development, subdivision, and floodplain regulations before construction.
Can I put a mobile home or tiny house on my land in Hood County?
The county itself says it can't tell you whether a specific property may legally have a mobile home, that depends on deed covenants, restrictions, or a private site evaluator, so this isn't something the Development Department will confirm over the phone.
Do I need a permit for a septic system?
Yes. Hood County's Environmental Health Department, acting as TCEQ's authorized local agent, requires a permit for installing, modifying, or replacing any On-Site Sewage Facility, and has its own homeowner maintenance training and reporting rules for aerobic systems.
Can I drill my own well?
You can, but the Upper Trinity Groundwater Conservation District requires registration before drilling and enforces spacing and acreage rules, so check with them before you dig.
New here, or not sure where this fits? Start here walks through the whole thing in order.
