Start here:System PlannerOne plan for power, heat and waterLand CheckAssess a parcel before you buy itFree CourseOff-grid from zero, in 12 lessons

Off-Grid Laws › New Hampshire › Sullivan County

Off-Grid Living in Unity, New Hampshire

Unity, New Hampshire is a zoned town with its own 2017 Land Use Ordinance and local building permitting, layered on top of state septic and well licensing rules. Several specifics, like a possible minimum dwelling size and greywater rules, are not confirmed in the official documents reviewed, so the Building Inspector and Planning Board should be contacted directly.

Is it legal to live off-grid in Unity, New Hampshire?

There is no outright ban on living off-grid in Unity, New Hampshire - it is legal but regulated. Zoning and land use are restricted, putting a cabin, tiny home, or RV on raw land is restricted, and building permits are restricted. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Unity before you buy land or build.

Read this before you act on anything below. This is my researched starting point for Unity, not legal advice and not a guarantee. Rules change, and the deciding facts on any specific parcel (setbacks, perc results, overlay districts, deed restrictions, road frontage) live at the county or town office, not in any database. Before you buy land or build, confirm the current rules directly with the local zoning and health offices - the sources on this page tell you exactly who to call.
Primary-source verified · reviewed Aug 202614 government, statute, or municipal sources are linked below; the verdict card cites them where a match exists.

The verdict for Unity

  • Zoning: Restricted
  • Dwellings, tiny homes: Restricted
  • Building permits: Restricted
  • Septic: Generally allowed
  • Greywater reuse: Unclear - verify
  • Rainwater harvesting: Generally allowed
  • Private wells: Generally allowed
  • Living disconnected from utilities: Unclear - verify

Unity at a glance

Zoning & raw-land occupancy
RestrictedUnity has its own Land Use Ordinance (2017) adopted under state RSA 674 authority and administered by the Planning Board; it is a zoned town, not an unzoned one. source
Dwellings, tiny homes & RVs
RestrictedUnity's ordinance sets some minimum dwelling standards and requires a Conditional Use Permit process for accessory dwelling units; a possible 750-sq-ft minimum was mentioned by a non-official source but is not confirmed in the ordinance text itself, so check with the Building Inspector for tiny home or RV occupancy rules. source
Building permits & codes
RestrictedUnity requires a local building permit for construction and occupancy of dwellings, enforced by the Building Inspector, with violations enforceable under the state's RSA 676:17. source
Septic & composting toilets
Generally allowedThe state's NH DES Subsurface Systems Bureau must approve septic installation, replacement, or expansion, and Unity's building permit form requires the septic designer's name, license number, and state approval number; composting toilets are not addressed in the local ordinance and are not confirmed. source
Greywater reuse
Unclear - verifyNo Unity-specific greywater rule was found in the ordinance or permit documents, so this is not confirmed at the local level; ask the Building Inspector or Planning Board before building a reuse system.
Rainwater harvesting
Generally allowedNo Unity ordinance language restricts rainwater harvesting, so the state's default plumbing code baseline applies.
Private wells & water rights
Generally allowedPrivate wells fall under the state's RSA 482-B licensing framework, and Unity's building permit form simply asks for well/water contractor details, with no additional town-specific well ordinance found. source
Living disconnected from utilities
Unclear - verifyNo blanket rule requiring connection to municipal water or sewer was found in Unity's ordinance documents; a Certificate of Occupancy is required before move-in, tied to septic approval, but a full off-grid utility rule is not confirmed. source

Who to call in Unity

Offices named on official pages during research. Phone numbers appear only when the official page showed one; confirm hours and jurisdiction before you drive out.

I've been digging into what off-grid living actually looks like in Unity, New Hampshire, and the short version is: Unity is a zoned town, not one of those wide-open unzoned New England spots people sometimes hope for. The town adopted its own Land Use Ordinance back in 2017 under the state's RSA 674 authority, and it's administered by the Planning Board. So anything you build or occupy here answers to both state rules and Unity's local ordinance.

Zoning and dwellings. Unity's ordinance covers accessory dwelling units through a Conditional Use Permit process, and the Planning Board has thirty days to act on a certificate of compliance once you apply. Non-residential or multi-family projects also trigger site plan review under state law (RSA 674:43 and 44). On dwelling size, I've seen a secondhand reference to a 750-square-foot minimum floated by a commercial permit-guide site, but I could not confirm that figure directly in the ordinance text itself. If you're planning a tiny home or thinking about living in an RV, don't take my word or that source's word for it, call the Building Inspector or Planning Board and get the current minimum in writing.

Building permits. Unity requires a local building permit for construction, alteration, or occupancy changes to a single-family dwelling. Once issued, a permit becomes void if work doesn't start within six months, and you need to pick it up within 30 days. The Building Inspector, Paul Moeller, has authority to inspect permitted buildings, and violations are enforceable under the state's RSA 676:17.

Septic. This is a two-layer system. The state, through NH DES's Subsurface Systems Bureau, has to approve any septic system before it's installed, replaced, or expanded, and you certify compliance with local requirements as part of that. Unity's own building permit form asks for your septic designer's name, NH license number, and state approval number. Composting toilets aren't mentioned anywhere I found in Unity's ordinance, so that's genuinely unclear at the local level.

Greywater and rainwater. I found no Unity-specific language on either. Greywater sits in the same unclear bucket the state leaves it in, so ask before you build a reuse system. Rainwater harvesting appears to be fine by default, since nothing in the local ordinance restricts it and the state plumbing code baseline applies.

Wells. Standard state licensing under RSA 482-B governs private wells, and Unity's permit form just wants your well/water contractor info. No town-specific well ordinance beyond that.

Utilities. I did not find a blanket rule forcing homes to connect to municipal water or sewer. You do need a Certificate of Occupancy before moving in, tied to septic approval, but going off-grid on utilities specifically isn't addressed head-on in what I reviewed.

Bottom line: Unity isn't hostile to off-grid living, but it's not a rule-free zone either. Confirm the specifics with the town before you commit to a plan.

Unity in numbers

Worst-month sun
2.9 peak hours/day (4.6 annual average)
Heating degree days
8,251
Precipitation / snow
41.49 in / 60.1 in a year
Frost-free season
05-19 to 09-25
Elevation
1,460 ft
Hospital
Valley Regional Healthcare · 7.6 mi
Fire station
Goshen Fire Department · 5.5 mi
Supermarket
Market Basket · 5.7 mi
Hardware
The Home Depot · 5.3 mi

Open the full site report for this spot →

30-year climate normals for the nearest ZIP and distances from the town center; a specific parcel will differ. Run the site report on an address for its own numbers.

Planning a build in Unity

The rules above decide what you may build. The numbers below decide what you will have to build, and they come from this place rather than from a national average.

Solar: size for the worst month, not the average

Unity averages 4.6 peak sun hours a day across the year, but its worst month averages 2.9. That is a drop of about 38 percent. An array sized on the annual figure will therefore come up short in the worst month by roughly that much, in the season when lights, pumps, and heating fans all run hardest.

Put another way, meeting the same daily load in the worst month here takes about 1.6 times the array that the annual average implies, or a generator and the fuel budget to run it. Neither is wrong; what is wrong is discovering the gap in the first winter. The solar calculator runs this arithmetic against your own load list, and lesson four covers building that list before buying panels.

Heat: 8,251 heating degree days

That is a severe heating season, where the building envelope matters more than any appliance you can buy. Heating demand at this level dwarfs everything electrical in the house, which is why almost nobody here heats with electricity from a battery bank.

As a rough order of magnitude, a small, reasonably insulated cabin heated mainly with wood in a climate like this tends to burn in the region of 6.9 cords a season, with the real figure swinging widely on insulation, house size, and how you burn. Treat that as a bracket for planning your woodshed rather than a promise, split and stack a season ahead, and check with a moisture meter before burning. The firewood calculator and heat-loss calculator narrow it down from your own building.

Growing season: about 129 frost-free days

Average last frost falls around 05-19 and average first frost around 09-25, which leaves roughly 129 days between them. That figure decides what can be grown outdoors without protection, whether a season extension structure is worth building, and how much of the year food storage has to cover. Averages also hide the frost that arrives two weeks early, so plan the garden on the short end. The garden calculator and food storage calculator work from this number.

Water: what the roof would actually catch

Unity receives about 41.5 inches of precipitation a year. A 1,000 square foot roof here would shed on the order of 21,971 gallons a year at a realistic 85 percent collection efficiency, before any losses to first-flush diversion, evaporation, or overflow in a heavy storm.

The annual total is the easy part. What sizes a cistern is the longest dry stretch, because catchment is seasonal almost everywhere and a tank that covers the average year can still run empty in August. Check the local rules too: rainwater harvesting is regulated in some states even where it is broadly allowed. The rainwater calculator works from your own roof and rainfall pattern, and lesson three covers why water is chosen before power.

Snow: 60 inches in an average year

At this level, snow is a design input rather than a nuisance. It sets the roof load your structure has to carry, it decides where a metal roof may safely shed and therefore where doors, propane tanks, and walkways must not be, and it buries a ground-mounted array at exactly the time of year the array matters most. It also makes the driveway a system: how it is graded, where the snow is pushed, and who clears it when you cannot.

Distance is part of the plan

Measured straight line from the center of Unity: the nearest fire station is about 5.5 miles away (Goshen Fire Department), the nearest hospital is about 7.6 miles away (Valley Regional Healthcare), the nearest supermarket is about 5.7 miles away (Market Basket). Road miles will be longer, and in winter longer again.

The fire distance is worth noting before you buy rather than at renewal: insurers commonly rate rural property partly on how far it is from a responding station and from a water source, and some decline off-grid or owner-built structures outright. Ask an agent who writes rural policies what they would need to see, while the answer can still change what you build. Lesson eleven covers the insurance and financing side.

The hospital distance sets what your first aid kit and your medical plan have to cover in the gap, and it is the number to think about before anyone in the household depends on refrigerated medication or mains-powered equipment.

Confirming this for your own parcel

On this page 2 of the eight topics are recorded as unclear or as varying within Unity: greywater, mandatory utility connection. Those are the calls to make first, because they are the ones where a general answer cannot be trusted for a specific parcel. Ask for the answer in writing where the office will give it, and note the name and the date where it will not.

Where a topic is recorded as settled here (zoning, what counts as a dwelling, building permits and codes, septic and sewage, rainwater harvesting, wells and water rights), the source is cited further down this page. Sources go stale, ordinances get amended, and this site logs corrections publicly rather than editing them away, so if you find something here that no longer matches the county, the corrections page is how to say so.

Before any of those calls, walk the parcel with the land walk checklist and take the questions for the county with you. The parcel check pulls flood, wetland, slope, and access data for a specific parcel and shows its sources, which is a good way to arrive at the office with the questions already framed. Lesson two is the wider version of this list.

Looking at a specific parcel in Unity, NH?The rules above are the jurisdiction. The land check runs the parcel itself: flood zone, soils and septic suitability, wetlands, slope, access, climate, and these verdicts, from a parcel number or coordinates.
Check a parcel →

Live here? Help keep Unity accurate.

Residents, landowners, builders, and town officials: confirm what is right or tell me what is wrong. Every note is checked before it appears. Two minutes, no account.

This page is

FAQ

Common questions about off-grid living in Unity

Is it legal to live off-grid in Unity, New Hampshire?

There is no outright ban on living off-grid in Unity, New Hampshire - it is legal but regulated. Zoning and land use are restricted, putting a cabin, tiny home, or RV on raw land is restricted, and building permits are restricted. Plan around septic/wastewater (generally allowed) and disconnecting from utilities (not clearly documented online, so confirm it locally). Because these rules are set locally, confirm the specifics with Unity before you buy land or build.

Is Unity, NH an unzoned town where I can just build off-grid freely?

No. Unity has its own Land Use Ordinance adopted in 2017 under state authority, administered by the Planning Board, so building and occupying land here is subject to local review.

Can I live in a tiny home or RV in Unity?

This isn't fully confirmed. A minimum dwelling size may apply per Unity's ordinance, and a commercial source mentions 750 square feet, but that figure wasn't verified directly in the ordinance text. Call the Building Inspector before you plan around it.

Do I need a permit for a septic system?

Yes, two layers apply: the state's NH DES Subsurface Systems Bureau must approve the system, and Unity's building permit application requires your septic designer's license and state approval numbers.

Are composting toilets allowed?

Not addressed in the Unity ordinance documents reviewed, so this is unclear. Confirm with the Building Inspector or NH DES.

Can I collect rainwater or reuse greywater?

Rainwater harvesting appears permitted by default since no local restriction was found. Greywater reuse is unclear locally and at the state level, so check before installing a system.

Do I have to hook up to municipal utilities?

No blanket requirement was found in Unity's ordinance documents, though a Certificate of Occupancy tied to septic approval is required before you move in.

New here, or not sure where this fits? Start here walks through the whole thing in order.